Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
ASX ANNOUNCEMENT
ASX: AXL | FSE: HN8
28 January 2026
QUARTERLY ACTIVITIES & CASHFLOW REPORT
HIGHLIGHTS
Caladão REE/Gallium Project – 145% REE and 339% Gallium Resource Growth
Caladão Project – Resource Growth:
• Delivered a maiden Mineral Resource Estimate (MRE) for Area B of 339Mt @ 1,075ppm TREO and
36.6ppm gallium, expanding the Caladão resource base by 145% (REE) and 339% (gallium)
• The combined Area A + B MRE now stands at 572 Mt @ 1,506 ppm TREO and 439 Mt @ 38 ppm Ga,
covering ~151 km² (~35% of the Caladão Project area)
• This positions Caladão as a district-scale ionic clay REE project and one of the largest primary
gallium deposits globally
Caladão Project – Metallurgy & ISL Breakthrough:
• Breakthrough metallurgical tests at the Woolrich in-situ leach (ISL) target (Area B) confirmed strong
amenability to low-cost ISL extraction
• Magnesium sulphate (MgSO₄) leaching of auger samples achieved ~464ppm soluble TREO in
solution, with the leachate showing a high proportion of magnet rare earth oxides (MREO ~42%, NdPr
~40%)
• Results comparable to grades at operating Gerik ISL clay REE (Malaysia), highlighting the potential
for a low-CAPEX, low-OPEX ISL development at the Caladão project
Caladão Project – Exploration Upside:
• Three new exploration licences (total ~867 ha) contiguous to the Area A MRE were granted, extending
Axel’s footprint in the Caladão Lithium Valley district
• An immediate 49-hole auger drilling program was initiated on these licences to delineate gallium-
rich laterites and REE-enriched saprolite, aiming to drive further resource growth adjacent to the
existing Area A resource
Caldas Project – Drilling Success:
• Auger drilling during the quarter expanded the REE-mineralised footprint across multiple prospects
within the Poços de Caldas alkaline complex
• Drilling encountered broad, near-surface clay-hosted REE mineralisation, including strong
intercepts from surface in a weathered saprolite horizon.
• These results reinforce Caldas as a district-scale REE discovery target akin to nearby ionic clay
deposits in the region (Meteoric’s Caldeira, Viridis’ Colossus)
Corporate:
• Strong cash position maintained with $7.1 million cash at quarter end
• Strengthened Board with the appointment of Mr. Aidan Nania as Non-Executive Director, following
the resignation of Mr. Ian Kiers
• 1.5 million performance rights vested during the quarter upon achievement of key milestones
Axel REE Limited (ASX: AXL, “Axel” or “the Company”) is pleased to provide its Quarterly Activities Report
for the quarter ending 31 December 2025.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
2
Exploration Activities for the Quarter
Caladão REE-Gallium Project
Mineral Resource Expansion – Area A & Area B
During the December quarter, the Company achieved a substantial increase in the Caladão Project’s REE
and Gallium resources.
In November, the Company engaged independent consultants GE21 Consultoria Mineral to undertake a
JORC (2012) resource estimate for Area B, building on the existing Area A resource of 233Mt @ 2,143ppm
TREO and 100Mt @ 42ppm Ga. This work culminated in a maiden Area B Inferred MRE of 339Mt @ 1,075ppm
TREO and 36.6ppm Ga (500ppm TREO cut-off).
Combined with Area A, the Caladão Project now hosts a total 572Mt @ 1,506ppm TREO and 439Mt @
38ppm Ga - increases of 145% (TREO) and 339% (Ga) over the prior MRE. This significant resource growth
(covering only ~35% of the Caladão project area) confirms Caladão’s status as a world-class ionic clay-
hosted REE + gallium deposit.
Figure 1. Location map of the Caladão Project and MRE at Area A and Area B.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
3
Deposit
JORC
Category
Tonnes
(Mt)
TREO
(ppm)
Gallium
(ppm)
NdPr
(ppm)
DyTb
(ppm)
MREO
(ppm)
Marambaia Inferred 126 1,154 35.8 261 12.9 274
Tiger Creek Inferred 85 1,050 40.1 117 8.0 125
Woolrich Inferred 128 1,013 35.1 179 10.9 190
Total (Area B) MRE Inferred 339 1,075 36.6 194 10.9 205
Table 1: Mineral Resource Estimate Summary – Area B
Deposit
JORC
Category
Tonnes
(Mt)
TREO
(ppm)
Caladão Area A Inferred 233 2,133
Caladão Area B Inferred 339 1,075
Total (Global) MRE Inferred 572 1,506
Table 2: Inferred REE MRE Area A & Area B for a total MRE of 572Mt
Deposit
JORC
Category
Tonnes
(Mt)
Ga
(ppm)
Caladão Area A Inferred 100 42
Caladão Area B Inferred 339 36.6
Total (Global) MRE Inferred 439 38
Table 3: Inferred Gallium MRE Area A & Area B for a total MRE of 439Mt
Metallurgical Breakthrough (Woolrich ISR Target):
During the quarter, the Company announced highly encouraging metallurgical and hydrogeological test
results from the Woolrich target within Area B. Woolrich is being evaluated for in-situ recovery (ISR)
potential, given its deep weathering and clay-hosted REE profile. Magnesium-sulfate leach testing on auger
samples returned strong soluble TREO grades, including intercepts such as 10m @ 590 ppm soluble TREO
(from 5 m depth, ending in 457 ppm) and 4m @ 514 ppm (ending in 629 ppm).
Soluble REE grades in the best Woolrich intervals (~464 ppm) are comparable to those at the operating Gerik
ISL mine in Malaysia (486 ppm soluble TREO), highlighting the competitive tenor of the mineralisation.
Importantly, the Woolrich clay profile exhibits a magnet REE-enriched assemblage, with approximately 42%
of the soluble TREO comprising magnet rare earth oxides (MREO) (NdPr, DyTb). This magnet-rich basket is
expected to enhance project economics.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
4
Figure 1. Location map of the TREO soluble results at Woolrich ISL Deposit.
Higher soluble grades were observed at depth, consistent with ionic adsorption clay enrichment, indicating
potential to increase average recoverable grades as drilling probes deeper into the saprolite. These
breakthrough ISR results provide a strong technical foundation as Axel advances feasibility studies. Ongoing
work will integrate the leach data with geological models to refine the clay horizon continuity and select
optimal zones for future ISR pilot testing.
A comparison of the Woolrich ISL deposit’s soluble TREO and MREO assemblage with selected IAC and ISL
peers, including the Gerik ISL REE mine and several advanced scoping and prefeasibility-stage projects
(EMA, Colossus, Caldera and Carina), is provided in Table 4 below.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
5
Company – Project
CAPEX
(USD
Million)
SOLUBLE
TREO
(ppm)
MREO/
TREO (%)
NdPr/
TREO (%)
DyTb/
TREO (%)
Axel REE – Caladão Project, Woolrich ISL - 464 42.0 40.0 2.0
MCRE Resources/Southern Alliance Mining -
Gerik ISL REE Mine
20 486 30.01
27.0 3.0
Brazilian Critical Minerals (ASX:BCM) – EMA
Project
55 - 41.52
40.6 0.9
Viridis Mining (ASX:VMM) – Colossus Project 358 - 39.03
37.5 1.4
Meteoric Resources (ASX:MEI) – Caldera
Project
443 - 31.64
30.6 1.0
Aclara Resources (TSX: ARA) – Carina Project 680 459 31.55
27.4 4.1
Table 4. Soluble MREO Grades Demonstrating Competitive Positioning of the Woolrich Deposit.
Note: All rare earths in solution will report in the final product, the Mixed Rare Earth Carbonate (MREC)
The successful leach results at Woolrich validate the ISL development concept for Caladão, indicating that
Caladão’s ionic clay mineralisation could be economically recovered via in-situ mining techniques similar
to those deployed in Chinese and Malaysian clay REE operations. Importantly, the Woolrich target also
exhibits favourable site characteristics for ISL (flat lateritic plateau underlain by impermeable fresh granite
acting as a hydrologic basement).
Figure 3. Schematic diagram of the in situ leaching process for rare earth ore.
Source info: Hu, Mingbing & Shao, Yajian & Chen, Guoliang. (2025). Kinetics of Ion Exchange in Magnesium Sulfate Leaching of Rare Earths and Aluminum from Ionic Rare Earth Ores. Minerals.
15. 290. 10.3390/min15030290.
ISL Trial Mining - Commercial and Technical Strategy Progress
On the back of results to date, Axel has defined a clear path forward for the Caladão Project’s development.
A dedicated work program is underway to refine ISL parameters and advance the project toward a pilot trial.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
6
This includes infill and further drilling at Woolrich to delineate zones of highest soluble REE grades and to
gather hydrogeological data.
The Company is also undertaking a specialised “soluble TREO” resource estimation, incorporating
leachability data to quantify the subset of the resource most amenable to ISL. These steps will feed into a
technical studies to evaluate a modular in-situ recovery operation, with the ultimate goal of designing and
permitting an on-site ISL trial mine initially at Woolrich. In parallel, representative commercial MREC
samples will be generated for customer qualification, while detailed, evergreen pricing assumptions and
cost input datasets will be compiled to support commercial-scale FID modelling as part of a fully integrated
life-of-mine (LOM) model.
New Licences & Drilling
In October, Axel REE was granted three new exploration licences totalling 867 hectares adjacent to Caladão
Area A. These licences cover extensions of the fertile Caladão Granite and saprolite host units, providing
immediate upside for resource growth.
Figure 4. Planned auger drill program over newly granted licences which are contiguous with the Area A 233Mt REE and
100Mt Ga Resources.
The Company swiftly mobilised a 49-hole auger drilling program on the new licence areas to test for gallium-
rich laterite and REE mineralisation in the shallow profile. Drilling is targeting analogous clay-hosted REE and
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
7
Ga horizons contiguous with known deposits. Initial field observations are encouraging, and assay results
from this program are expected to guide resource extension efforts in the coming quarter.
Caldas REE Project
Auger Drill Results – Expanded REE Footprint
During the quarter, Axel accelerated exploration at the Caldas REE Project in Minas Gerais, with auger drilling
yielding further encouraging results. Drilling was focused on multiple prospect areas around the rim of the
Poços de Caldas alkaline caldera – a world-class geological complex known to host ionic clay REE
mineralisation (e.g. Meteoric Resources’ Caldeira Project and Viridis Mining’s Colossus Project).
Figure 5. Caldas Project location.
The latest assays confirmed broad zones of near-surface REE mineralisation across at least two
prospects (along the northern and eastern caldera margins), thereby expanding the mineralised footprint at
Caldas. Notably, auger hole CAL-AUG-079 intersected 6m @ 1,370ppm TREO (including ~33% MREO and
26% heavy REO) from 1m depth in a clay-rich saprolite profile. Several other holes returned high TREO grades
over multi-metre intervals (e.g. up to 10m @ ~1,550ppm TREO in CAL-AUG-083) with elevated proportions
of magnet rare earths in the oxide mix. These results indicate that the REE mineralisation at Caldas is of the
ionic adsorption clay (IAC) type, with a REE distribution (high Nd-Pr and appreciable Dy-Tb) comparable to
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
8
known IAC deposits. The confirmation of IAC-style mineralisation over a wide area underscores the potential
for a large, district-scale REE resource at Poços de Caldas.
Ongoing Exploration and Target Definition
Building on the positive drilling outcomes, Axel has launched the next phase of exploration to advance the
Caldas Project.
During the quarter, an additional auger drilling program commenced at the Caldas South prospect, which
lies along the external (southern) margin of the caldera. This program targets REE-enriched saprolite
developed over the granite/gneiss basement at Caldas South, aiming to extend the known mineralisation
footprint further around the caldera rim.
The Company plans to complete the remaining auger holes in early 2026, after which all drilling data (North,
Central, East, South prospects) will be integrated and reviewed. Following completion of drilling, Axel’s
geology team will define an initial Exploration Target for the Caldas Project, in accordance with JORC 2012
guidelines.
This Exploration Target will give the market an early indication of the potential scale of the REE mineralisation
contained within the project’s 228 km² landholding. In parallel, preparations are underway for metallurgical
testwork on composite samples from key Caldas prospects. These metallurgy studies – tailored to ionic clay
processing methods – will evaluate REE recoveries and reagent requirements, and will complement the
geological work by confirming that Caldas mineralisation responds to similar leaching techniques proven at
Caladão.
Together, the upcoming Exploration Target and metallurgical results will guide the design of next-stage
drilling and potential resource definition at Poços de Caldas, as Axel continues to advance this promising
REE project.
Corporate
Cash Position
The Company remains fully funded to execute its exploration strategy, with $7.1M in cash on hand as at 31
December 2025.
Board Changes
During the quarter, Axel REE undertook changes to its Board to support the Company’s growth. On 21
October 2025, the Company appointed Mr. Aidan Nania as a Non-Executive Director, bringing additional
corporate and resources sector experience to the Board. On the same date, Mr. Ian Kiers resigned as a Non-
Executive Director.
The appointment of Mr. Nania, whose background in corporate strategy in the resources sector, is expected
to assist Axel through its next phase of development.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
9
Performance Rights Vesting
Following the major resource milestone achieved at Caladão during the quarter, 1.5 million performance
rights vested in line with their terms.
Of these, 0.5 million Class A performance rights vested completion of Milestone A relating to completion of
the Company’s ASX listing and minimum tenure requirements. 250,000 shares were issued each to Non-
Executive Chairman Paul Dickson and former Non-Executive Director Ian Kiers.
In addition, 1.0 million Class E performance rights vested on completion of Milestone E relating to Axel REE
announcing an Inferred Mineral Resource exceeding 10Mt at a minimum grade of 1,000ppm TREO to the ASX
– a milestone reached with the Caladão Area A resource announcement released on 1 October 2025.
500,000 shares were issued each to Non-Executive Chairman Paul Dickson and former Non-Executive
Director Ian Kiers.
All requisite ASX notifications for the vesting and cessation of these unquoted securities were lodged during
the quarter.
Annual General Meeting
The Annual General Meeting was held on 26 November 2025. All resolutions were passed via poll.
ASX – Additional Information
5.3.1.
For the purpose of ASX Listing Rule 5.3.1, details of the Company’s exploration activities for the quarter,
including any material developments or changes in those activities, and a summary of the expenditure
incurred on those activities is set out in the relevant sections of this announcement. Total exploration
expenditure incurred during the period was approximately $482k.
5.3.2.
For the purpose of ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company or its subsidiaries.
5.3.3.
For the purpose of ASX Listing Rule 5.3.3, details of the tenements held by Company are set out at Schedule
1. During the period the Company resolved to relinquish tenements referred to as the Itiquira Project in Mato
Grosso due to lack of prospectivity. During the quarter, tenements 831515/2020, 831383/2025 and
831384/2025 were granted at the Caladão Project area contiguous to the Area A Mineral Resource Estimate
area.
5.3.4.
For the purpose of ASX Listing Rule 5.3.4, a comparison of the use of funds as per the Axel REE Prospectus
dated 7 June 2024 (Prospectus) and actual use of funds since ASX admission is presented below:
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
10
Use of Funds
Prospectus Estimate
(2 year period following
admission)
($ million)
Actual use of Funds until
31 December 2025
($ million) Variance
Exploration at the Projects 9.65 3.18 (6.47)
Expenses of the Offer 1.14 1.10 (0.04)
General and administration costs 2.51 2.33 (0.18)
Working capital 0.52 0.07 (0.45)
Total 13.82 6.68 (7.14)
The material variance relating to exploration expenditure was principally due to the following:
• The Company was admitted to the ASX on 19 July 2024 (Admission) and commenced trading on 23
July 2024. The Use of Funds Statement covers a 24-month period following Admission.
• The Company has reported Mineral Resource Estimates (MRE) for gallium and REE and significant
MRE upgrades during the period, completed preliminary metallurgical testwork, and continued to
define further exploration targets whilst maintaining cost efficiencies
• The Company remains on track to meet its stated objectives under the Prospectus at costs below
the Prospectus Estimates
• At the date of this announcement, the Company believes it remains on track to meet its intended
use of funds disclosed in the Use of Funds Statement over the 24 month period, including
progressing the current exploration programs at the flagship Caladão REE-Gallium Project and
Caldas REE Project.
5.3.5.
For the purpose of ASX Listing Rule 5.3.5, the Company made payments of approximately $147,824 to
related parties and their associates. These payments include directors’ fees/salaries and superannuation
contributions, and company secretary fees.
This announcement was authorised by the Board of Directors.
For enquiries regarding this release please contact:
Axel REE Limited
Julia Maguire
The Capital Network
P: +61 3 9249 9859
E: investors@axelreelimited.com.au
P: +61 2 8999 3699
E: julia@thecapitalnetwork.com.au
About Axel REE
Axel REE is a critical minerals exploration company which is primarily focused on developing the Caladão REE-Gallium
and Caldas REE Projects in Brazil. Together, the project portfolio covers over 1,000km² of exploration tenure in Brazil,
the third largest country globally in terms of REE Reserves.
Axel is advancing a low-cost, modular development concept at Caladão based on in situ recovery (ISR) of ionic clay-
hosted rare earth mineralisation using magnesium sulphate leaching. This approach aims to minimise surface
disturbance and capital intensity by deploying modular hydrometallurgical plants within wellfields. In parallel, Axel is
progressing metallurgical programs to unlock additional value from gallium and scandium within the near-surface
oxidised profile.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
11
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Caladão Project – Area A Inferred 233Mt @ 2,133ppm TREO
Marambaia – Area B Inferred 126Mt @ 1,154ppm TREO
Tiger Creek – Area B Inferred 85Mt @ 1,050ppm TREO
Woolrich – Area B Inferred 128Mt @ 1,013ppm TREO
Table 1. Inferred Rare Earth MRE Area A & Area B for a total MRE tonnage of 572Mt.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Caladão Project – Area A Inferred 100Mt @ 42.0ppm Gallium
Caladão Project – Area B Inferred 339Mt @ 36.6ppm Gallium
Table 2. Inferred Gallium MRE Area A & Area B for a total MRE tonnage of 439Mt.
The Company’s mission is to explore and develop REE and other critical minerals in vastly underexplored Brazil. These
minerals are crucial for the advancement of modern technology and the transition towards a more sustainable global
economy. Axel’s strategy includes extensive exploration plans to fully realize the potential of its current projects and
seek new opportunities.
Figure 6. Map of Axel REE key projects in Brazil
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
12
Competent Persons Statement
The information in this announcement that relates to Exploration Results is based on and fairly represents information
and supporting documentation compiled by Mr Antonio de Castro, BSc (Hons), MAusIMM, CREA who acts as AXEL´s
Senior Consulting Geologist through the consultancy firm, ADC Geologia Ltda. Mr. de Castro has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code). Mr Castro consents to the inclusion in the
announcement of the matters based on his information in the form and context in which it appears.
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the
Company. These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ
materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from anticipated in such information. These and all subsequent written and oral forward-looking information
are based onestimatesand opinions ofmanagement onthedates they are made and expressly qualified intheirentirety
by this notice. The Company assumes no obligation to update forward-looking information should circumstances or
management’s estimates or opinions change.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from:
• AXL ASX release 23 December 2025, “Axel MRE Delivers 145% REE Growth and 339% Gallium Growth”
• AXL ASX release 26 November 2025, “Breakthrough REE Metallurgy at Caladao In Situ Leach Target”
• AXL ASX release 13 November 2025, “Gallium and REE Resources To Expand With MRE at Area B”
• AXL ASX release 17 October 2025, “REE-Ga Licences Granted to Expand Caladao REE-Ga Resources”
• AXL ASX release 1 October 2025, “REE Mineral Resource Estimate”
• AXL ASX release 22 August 2025, “100Mt Gallium Mineral Resource Estimate”
The Company confirms that it is not aware of any new information or data that materially affects the information
contained in these announcements and, in the case of estimates of mineral resources, that all material assumptions
and technical parameters underpinning the estimates in the announcements continue to apply and have not materially
changed.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
13
Schedule 1 – Tenements at 31 December 2025
Tenement
Number Area (ha) Holder Location Interest Expiry Date
830500/2023 1460.5 Axel REE Ltda Piauí 100% 28-Jul-2026
830882/2023 8.12 Axel REE Ltda Piauí 100% 28-Jul-2026
830883/2023 57.57 Axel REE Ltda Piauí 100% Application pending
830886/2023 47.58 Axel REE Ltda São Paulo 100% 28-Jul-2026
830888/2023 7.77 Axel REE Ltda São Paulo 100% 28-Jul-2026
830889/2023 442.8 Axel REE Ltda São Paulo 100% Application pending
830890/2023 363.73 Axel REE Ltda Minas Gerais 100% 28-Jul-2026
830891/2023 5.63 Axel REE Ltda Minas Gerais 100% 28-Jul-2026
830893/2023 24.65 Axel REE Ltda Minas Gerais 100% 28-Jul-2026
803030/2023 1997.87 Axel REE Ltda Minas Gerais 100% 23-Mar-2026
803031/2023 1977.23 Axel REE Ltda Minas Gerais 100% 30-Mar-2026
803032/2023 1957.15 Axel REE Ltda Minas Gerais 100% 30-Mar-2026
820286/2023 16.56 Axel REE Ltda Minas Gerais 100% 26-Oct-2026
820287/2023 899.49 Axel REE Ltda Minas Gerais 100% 26-Oct-2026
820319/2023 1603.14 Axel REE Ltda Minas Gerais 100% 26-Sep-2026
830082/2023 1549.63 Axel REE Ltda Minas Gerais 100% 27-Feb-2026
830083/2023 1995.5 Axel REE Ltda Minas Gerais 100% 7-Feb-2026
830084/2023 1327.5 Axel REE Ltda Minas Gerais 100% 7-Mar-2026
830085/2023 1454.03 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
830451/2023 1919.96 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
830452/2023 148.72 Axel REE Ltda Minas Gerais 100% 28-Mar-2026
830453/2023 1502.79 Axel REE Ltda Minas Gerais 100% 19-Jun-2026
830454/2023 1299.51 Axel REE Ltda Minas Gerais 100% 23-Mar-2026
830455/2023 1227.51 Axel REE Ltda Minas Gerais 100% 23-May-2026
830456/2023 1080.58 Axel REE Ltda Minas Gerais 100% 28-Mar-2026
830457/2023 1317.8 Axel REE Ltda Minas Gerais 100% Application pending
830458/2023 1714 Axel REE Ltda Minas Gerais 100% 23-Mar-2026
830459/2023 1599.56 Axel REE Ltda Minas Gerais 100% 9-May-2026
830460/2023 1435.97 Axel REE Ltda Minas Gerais 100% Application pending
830461/2023 1914.17 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
830462/2023 1978.71 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
830463/2023 1917.61 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
830464/2023 1991.16 Axel REE Ltda Minas Gerais 100% 23-Mar-2026
830465/2023 1912.78 Axel REE Ltda Minas Gerais 100% 19-Jun-2026
830466/2023 1968.93 Axel REE Ltda Minas Gerais 100% 18-Apr-2026
830467/2023 826.86 Axel REE Ltda Minas Gerais 100% Application pending
830468/2023 910.99 Axel REE Ltda Minas Gerais 100% Application pending
830469/2023 1972.5 Axel REE Ltda Minas Gerais 100% 23-Mar-2026
830505/2023 1033.42 Axel REE Ltda Minas Gerais 100% 4-May-2026
830506/2023 786.64 Axel REE Ltda Minas Gerais 100% 4-May-2026
830515/2023 1963.87 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
14
Tenement
Number Area (ha) Holder Location Interest Expiry Date
830516/2023 1947.1 Axel REE Ltda Minas Gerais 100% 3-Apr-2026
830527/2023 386.89 Axel REE Ltda Minas Gerais 100% 23-Mar-2026
830880/2023 357.8 Axel REE Ltda Minas Gerais 100% Application pending
830881/2023 32.34 Axel REE Ltda Minas Gerais 100% Application pending
830884/2023 24.43 Axel REE Ltda Minas Gerais 100% 28-Jul-2026
830885/2023 695.36 Axel REE Ltda Minas Gerais 100% Application pending
830887/2023 25.17 Axel REE Ltda São Paulo 100% Application pending
830895/2023 102.82 Axel REE Ltda São Paulo 100% Application pending
831084/2023 1950.77 Axel REE Ltda São Paulo 100% 23-May-2026
831086/2023 1886.07 Axel REE Ltda Minas Gerais 100% 31-May-2026
831087/2023 1998.07 Axel REE Ltda Minas Gerais 100% 23-May-2026
831088/2023 1956.82 Axel REE Ltda Minas Gerais 100% 23-May-2026
831089/2023 1983.83 Axel REE Ltda Minas Gerais 100% 23-May-2026
831090/2023 1333.64 Axel REE Ltda Minas Gerais 100% 23-May-2026
831092/2023 1085.01 Axel REE Ltda Minas Gerais 100% 31-May-2026
833340/2023 936.03 Axel REE Ltda Minas Gerais 100% Application pending
833341/2023 1130.7 Axel REE Ltda Minas Gerais 100% Application pending
866051/2023 9892.33 Axel REE Ltda Mato Grosso 100% 8-Mar-2026
866052/2023 9989.08 Axel REE Ltda Mato Grosso 100% Cancelled2
866054/2023 9944.86 Axel REE Ltda Mato Grosso 100% Cancelled2
866055/2023 9753.55 Axel REE Ltda Mato Grosso 100% Cancelled2
831458/2020 1574.47 Axel REE Ltda Minas Gerais 100% 27-Nov-2027
831515/2020 884.39 Lobo Guara Mineracao
e Representacao Eireli1
Minas Gerais 100% 10-Oct-20283
831383/2025 43.24 Lobo Guara Mineracao
e Representacao Eireli1
Minas Gerais 100% 10-Oct-20283
831384/2025 42.10 Lobo Guara Mineracao
e Representacao Eireli1
Minas Gerais 100% 10-Oct-20283
831524/2020 1023.9 Foxfire Metals Ltda1
Minas Gerais 100% Application pending
1
100% beneficial interest in the mineral rights (other than lithium) in the REE Tenements were assigned to the Company.
2
During the quarter, the Company resolved to cancel tenements 866052/2023, 866054/2023 and 866055/2023 due to lack of
prospectivity.
3
During the quarter, tenements 831515/2020, 831383/2025 and 831384/2025 were granted to Lobo Guara Mineracao e Representacao
Eireli, whereby Axel REE holds 100% beneficial interest in the tenements.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AXEL REE LIMITED
ABN Quarter ended (“current quarter”)
50 665 921 273 31 DECEMBER 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
6 months
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(482) (1,047)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (29) (55)
(e) administration and corporate costs (297) (700)
1.3 Dividends received (see note 3) - -
1.4 Interest received 32 132
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (GST refunds) 26 64
1.9 Net cash from / (used in) operating
activities
(750) (1,606)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and
Share your feedback
Discover