28,321ppm TREO / 7,606ppm MREO Make Record Grades at Caladao
Released
Released
Announcement PDF
ASX ANOUNCEMENT
ASX : AXL
11 December 2024
28,321ppm TREO and 7,606ppm MREO Make Record
Grades in Latest Assays at Caladão Project
HIGHLIGHTS:
•
Company record high TREO assays up to 28,321ppm TREO (2.8% TREO) and up to
7,606ppm MREO (0.76% MREO) at the flagship Caladão Project in the Lithium Valley,
Brazil continues to confirm the deposit's World Class potential.
•
Strong near surface ultra high grade results include:
CLD-AUG-093:
14m @ 9,994ppm TREO (20% MREO) from 1m,
including
1m @ 28,321ppm TREO (27% MREO) from 9m,
and
1m @ 9,171ppm TREO (41% MREO) from 12m
CLD-DDH-010:
2.62m @ 4,067ppm TREO (26% MREO) from 21m,
CLD-DDH-011:
8.6m @ 3,432ppm TREO (26% MREO) from 36.55m,
•
Results continue to reveal widespread and laterally persistent REE mineralisation covering
the entire ~30km2 drilled zoned completed to date, representing less than 10% of total
Caladão Project target area
•
Results again confirm district scale discovery potential of the flagship Caladão Project with
significant distribution of high grade high value magnetic rare earths
•
Drill program continues with results progressively being released once received
Axel REE Limited (ASX: AXL, “Axel” or “the Company”) is pleased to announce Axel’s highest recorded
results from the Phase One 2,600m drill program at its flagship Caladão project in the Lithium Valley, Minas
Gerais. These results include the highest grade Total Rare Earth Oxide (TREO) and Magnet Rare Earth Oxide
(MREO) grades ever recorded at the Project, confirming the potential for Caladão to become an emerging
world class REE deposit.
Managing Director, Dr Fernando Tallarico, said:
“The exceptionally high grade results continue from our Caladao Project, surpassing our
expectations. Since our IPO in late July we have demonstrated that REE mineralisation
extends over a significant area, with impressive thickness of the mineralised clay profile.
The previously reported channel results and the overall distribution of the mineralised
intercepts show a remarkable lateral continuity, which is essential for building resource
volume.
From the first auger hole drilled in 2023, we have consistently seen strong ore grades
with high grade results returned from every batch in this program that commenced after
IPO. These record breaking assays represent a significant milestone for the Company
and reinforce the tremendous potential of the Caladão project.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
We have demonstrated that previously reported high grade assays were not isolated,
having received these new Company record results as high as 28,321ppm TREO and
7,606ppm MREO from this batch. These results are significantly high for a clay-hosted
REE project. The continuity of high grade mineralisation at shallow depths and along
strike highlights the scalability of this potential deposit, which we are confident that
further drilling will continue to demonstrate.”
The Caladão Project is located in the northeast portion of the State of Minas Gerais, and the overall geolgical
setting includes a sequence of Neoproterozoic sedimentary sequences that were intruded by late-tectonic
alkaline granites. These granites have undergone intense tropical weathering, resulting in the development
of a thick regolith profile that can reach up to 60 metres and contains abundant clay minerals.
The clay horizon at the Caladão Project includes abundant kaolinite, a mineral known for its ability of
adsorbing the REE and typically produces regolith-hosted ionic-adsorption REE mineralisation.
The Company ‘s Phase One diamond and auger drilling program has focused predominately at Area A (Figure
1), where mineralised intercepts have occurred over a vast area of ~30km2, representing ~10% of the total
Caladão Project area. Drilling at Area A has been highly successful, where lateral persistence of the
mineralisation is occurring in all directions.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
2
Figure 1 - Assay results of Caladão Area “A” target over digital elevation model (DEM). Note
widespread distribution of high-grade REE intercepts covering a ~30km2 area.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
3
From
(m)
To
(m)
Length
(m)
TREO
(ppm)
MREO
(ppm)
MREO
(%)
NdPr
(ppm)
DyTb
(ppm)
CLD-AUG-091
7
15
8
1,770
204
12
192
12
ending with
11
15
4
1,866
259
14
243
16
CLD-AUG-092
0
15
15
2,209
538
22
510
27
ending with
6
15
9
2,611
757
29
717
39
CLD-AUG-093
1
15
14
9,944
2,000
16
1,914
86
including
9
15
6
13,869
4,360
33
4,201
159
with
9
10
1
28,321
7,606
27
7,349
257
CLD-AUG-102
6
15
9
1,760
355
18
338
17
ending with
12
15
3
2,263
622
27
593
29
CLD-AUG-104
0
14
14
2,119
148
7
137
12
ending with
10
14
4
2,542
270
11
249
21
CLD-AUG-105
3
15
12
2,098
381
18
362
20
ending with
7
15
8
2,286
430
19
409
22
CLD-AUG-107
1
10
9
1,617
152
10
143
9
ending with
11
15
4
1,755
218
12
211
7
CLD-AUG-108
12
17
5
2,475
416
17
401
15
ending with
1
7
6
5,272
2,041
37
1,889
152
CLD-AUG-113
0
15
15
1,828
351
17
335
16
ending with
10
15
5
2,916
669
23
639
30
CLD-AUG-116
5
14
9
6,550
622
9
589
33
ending with
13
14
1
8,604
2,851
33
2,732
119
CLD-AUG-117
3
6
3
1,708
410
22
386
25
ending with
7
12
5
1,511
369
24
340
29
CLD-DDH-010
21
23.62
2.62
4,067
1,048
26
985
62
including
22
23
1
5,155
1,269
25
1,190
79
CLD-DDH-011
36.55
45.15
8.6
3,432
884
24
847
37
ending with
44
45.15
1.15
6,500
1,923
30
1,850
73
CLD-DDH-012
28
34.95
6.95
3,922
289
8
280
9
including
32
34
2
6,548
342
6
332
11
HoleID
Table 1: Summary of significant diamond (DDH) and auger (AUG) drill intercepts (1,000ppm cutoff)
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
4
Figure 1 - Cross section of CLD-AUG-093 with peak value 1m @ 28,321 ppm TREO, showing consistency
of thick intervals of REE-mineralised clays at the Caladão Project.
The drilling program to date has shown expressive thicknesses of mineralisation occurring in the saprolite profile
at depths ranging from 27m to 60m.
Notably, all auger holes to date have ended with high grade REE mineralisation (Table 1) which again
demonstrates the high grade consistency of the Project. Auger holes usually have a limited depth of penetration
in the weathering profile, averaging around 15m depth at the Caladão Project. The auger holes are sampling only
the upper part of the mineralised profile and clearly indicate that the mineralisation is open at depth, as shown
in the vertical geological cross-section in Figure 2.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
5
Figure 2 - Chip Box CLD-AUG-093 depth profile. Note the upper part of weathering profile is highly oxidized, red-ish
in color and poor in kaolinite. With depth the profile becomes richer in kaolinite, which is reflected in the lighter
color and significant high grade REE. From 9 to 10 meters the highest TREO grade recorded in the project so far
28,321 ppm TREO.
Caladão Project
The ongoing Phase One drill campaign at the Caladão Project in the Lithium Valley, Minas Gerais, continues
with 134 auger and 32 diamond drillholes for 2,974m metres drilled across key target areas completed to
date. Drill samples have been sent to SGS and are expected to return in batches progressively in the coming
weeks. The data collected from these drillholes will be used to support a potential REE resource within this
project area.
This announcement was authorised by the Board of Directors.
For enquiries regarding this release please contact:
Fernando Tallarico
Managing Director
fernando@axelreelimited.com.au
Investor & Media Relations
Andrew Willis
awillis@nwrcommunications.com.au
About Axel REE
Axel REE is a critical minerals exploration company which is primarily focused on exploring the Caladão, Caldas,
Itiquira, and Corrente rare earth elements (REE) projects in Brazil. Together, the project portfolio covers over 1,105km²
of exploration tenure in Brazil, the third largest country globally in terms of REE Reserves.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
6
The Company’s mission is to explore and develop REE and other critical minerals in vastly underexplored Brazil. These
minerals are crucial for the advancement of modern technology and the transition towards a more sustainable global
economy. Axel’s strategy includes extensive exploration plans to fully realize the potential of its current projects and
seek new opportunities.
Competent Persons Statement
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources, or Ore
Reserves is based on information compiled by Dr. Fernando Tallarico, who is a member of the Association of
Professional Geoscientists of Ontario, and Dr. Paul Woolrich, who is a Competent Person and a Member of the
Australian Institute of Mining and Metallurgy (AusIMM). Dr Tallarico is a full-time employee of the company. Dr. Tallarico
and Dr. Woolrich have sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves. Dr. Tallarico and Dr.
Woolrich consent to the inclusion in the report of the matters based on their information in the form and context in
which it appears.
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the
Company. These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ
materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from anticipated in such information. These and all subsequent written and oral forward-looking information
are based on estimates and opinions of management on the dates they are made and expressly qualified in their entirety
by this notice. The Company assumes no obligation to update forward-looking information should circumstances or
management’s estimates or opinions change.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
7
Table 2 - Assay Results (1,000ppm TREO cutoff)
HoleID
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-091
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-092
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
ASX : AXL
ACN: 665 921 273
From
(m)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
To
(m)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
Interval
(m)
8m @ 1,770ppm TREO
15m @ 2,209ppm
TREO
14m @ 9,944ppm
TREO
TREO
(ppm)
433
446
400
460
763
836
721
1,144
1,416
2,208
1,929
2,334
1,978
1,265
1,887
1,171
1,062
2,050
1,692
1,829
1,823
2,719
2,502
2,006
2,901
2,487
2,738
2,855
2,773
2,521
949
1,591
1,749
3,578
4,034
5,318
12,890
13,274
13,566
28,321
15,929
10,704
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
72
73
64
75
111
104
84
72
183
136
206
268
274
203
292
118
117
170
186
275
388
641
655
571
1,001
799
798
883
776
686
39
29
33
47
53
75
218
377
1,008
7,605
4,397
3,531
MREO
(%)
17
16
16
16
15
12
12
6
13
6
11
11
14
16
15
10
11
8
11
15
21
24
26
28
35
32
29
31
28
27
4
2
2
1
1
1
2
3
7
27
28
33
NdPr
(ppm)
68
69
61
72
106
98
79
66
173
128
196
253
258
191
271
111
110
162
178
264
372
616
631
546
961
760
754
828
724
637
36
26
31
42
48
68
178
301
903
7,349
4,230
3,389
DyTb
(ppm)
4
4
4
4
5
5
6
5
11
8
10
14
16
12
20
7
7
8
8
11
16
25
25
25
40
39
44
55
52
48
3
3
3
4
5
7
41
76
105
257
166
141
www.axelreelimited.com.au
info@axelreelimited.com.au
8
HoleID
CLD-AUG-093
CLD-AUG-093
CLD-AUG-093
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-102
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-104
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
ASX : AXL
ACN: 665 921 273
From
(m)
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
0
1
2
3
4
5
6
7
8
9
10
11
To
(m)
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
Interval
(m)
9m @ 1,760ppm TREO
14m @ 2,119ppm
TREO
12m @ 2,098ppm
TREO
TREO
(ppm)
13,702
9,171
5,387
502
560
502
574
741
758
1,111
1,395
1,304
1,629
1,744
1,870
2,049
2,294
2,446
1,261
1,850
2,279
2,119
2,613
1,980
1,666
1,493
2,194
2,045
2,812
2,082
2,374
2,900
677
883
856
1,281
2,228
1,519
1,864
3,677
1,885
1,856
2,502
2,375
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
4,994
3,742
1,890
67
86
70
80
102
96
91
109
92
242
333
459
530
668
667
54
45
46
51
98
166
135
98
175
130
196
212
212
460
130
175
171
260
430
280
159
499
384
383
539
522
MREO
(%)
36
41
35
13
15
14
14
14
13
8
8
7
15
19
25
26
29
27
4
2
2
2
4
8
8
7
8
6
7
10
9
16
19
20
20
20
19
18
9
14
20
21
22
22
NdPr
(ppm)
4,805
3,613
1,817
62
80
65
74
97
90
86
103
86
231
319
438
506
638
636
49
41
42
47
90
157
129
91
160
117
177
194
194
431
122
165
161
247
412
263
149
473
366
365
514
497
DyTb
(ppm)
189
129
73
5
6
5
5
6
6
5
6
6
11
15
21
25
30
31
5
4
4
4
8
9
7
7
16
13
19
18
19
29
8
10
10
14
18
17
10
26
18
19
25
25
www.axelreelimited.com.au
info@axelreelimited.com.au
9
HoleID
CLD-AUG-105
CLD-AUG-105
CLD-AUG-105
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-106
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-107
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
ASX : AXL
ACN: 665 921 273
From
(m)
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
0
1
2
3
4
5
6
7
8
9
10
To
(m)
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
Interval
(m)
3m @ 1,504ppm TREO
1m @ 1,173ppm TREO
1m @ 1,260ppm TREO
1m @ 1,252ppm TREO
2m @ 1,229ppm TREO
9m @ 1,617ppm TREO
4m @ 1,754 ppmTREO
4m @ 1,820ppm TREO
TREO
(ppm)
2,228
2,062
1,701
857
1,006
1,895
1,612
901
941
1,173
846
1,260
956
915
1,252
823
1,314
1,144
971
1,176
1,143
1,302
1,717
2,084
2,518
1,695
1,434
1,480
934
1,454
2,151
1,812
1,601
376
461
470
552
365
518
1,162
1,272
2,375
2,473
857
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
446
316
354
25
21
24
17
12
11
12
12
17
18
23
25
35
63
77
108
134
131
135
140
130
122
162
197
216
85
149
319
219
183
56
66
68
83
58
75
203
236
438
433
162
MREO
(%)
20
15
21
3
2
1
1
1
1
1
1
1
2
3
2
4
5
7
11
11
11
10
8
6
5
10
14
15
9
10
15
12
11
15
14
14
15
16
14
17
19
18
18
19
NdPr
(ppm)
424
299
331
23
19
21
14
10
9
10
10
14
16
21
23
32
59
73
102
126
123
127
132
123
115
152
185
202
80
143
311
213
175
52
60
62
78
54
70
192
226
418
410
154
DyTb
(ppm)
22
17
23
3
2
3
3
2
2
2
2
3
2
2
2
3
4
4
7
8
7
8
8
8
8
10
12
14
6
6
8
7
7
5
5
5
6
4
5
11
10
20
23
8
www.axelreelimited.com.au
info@axelreelimited.com.au
10
HoleID
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-108
CLD-AUG-110
CLD-AUG-110
CLD-AUG-110
CLD-AUG-110
CLD-AUG-110
CLD-AUG-110
CLD-AUG-110
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-111
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-112
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
ASX : AXL
ACN: 665 921 273
From
(m)
11
12
13
14
15
16
0
1
2
3
4
5
6
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
0
1
2
3
4
5
6
7
8
0
1
2
3
4
5
To
(m)
12
13
14
15
16
17
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
Interval
(m)
5m @ 2,475ppm TREO
6m @ 1,473ppm TREO
2m @ 1,969ppm TREO
1m @ 2,373ppm TREO
15m @ 1,828ppm
TREO
TREO
(ppm)
744
1,367
1,815
4,120
1,741
3,330
911
1,148
1,567
1,516
1,260
1,449
1,897
381
400
570
530
805
520
340
272
361
303
471
674
740
844
1,967
1,971
277
248
190
455
258
336
285
419
2,373
1,057
1,104
1,343
1,169
1,344
1,358
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
133
278
327
675
311
491
21
28
25
37
28
21
27
37
41
51
45
61
33
21
21
22
28
23
28
38
33
26
42
19
16
19
23
20
29
25
45
147
125
136
139
118
148
193
MREO
(%)
18
20
18
16
18
15
2
2
2
2
2
1
1
10
10
9
8
8
6
6
8
6
9
5
4
5
4
1
2
7
6
10
5
8
9
9
11
6
12
12
10
10
11
14
NdPr
(ppm)
126
267
315
655
299
471
18
25
22
33
25
18
23
34
38
48
42
56
30
18
19
19
25
20
24
34
30
24
38
17
14
17
21
18
26
23
41
140
117
129
131
112
141
185
DyTb
(ppm)
8
11
12
20
12
20
3
3
3
4
3
3
4
3
3
4
3
4
3
2
2
2
3
3
3
4
3
3
4
2
2
2
2
2
2
2
3
7
8
8
7
6
6
8
www.axelreelimited.com.au
info@axelreelimited.com.au
11
HoleID
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-113
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-116
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-AUG-117
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
ASX : AXL
ACN: 665 921 273
From
(m)
6
7
8
9
10
11
12
13
14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
0
1
2
3
4
5
6
7
8
9
10
11
0
1
2
3
4
5
6
7
8
To
(m)
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
Interval
(m)
9m @ 6,550ppm TREO
3m @ 1,708ppm TREO
5m @ 1,511ppm TREO
TREO
(ppm)
1,348
1,343
1,349
1,418
3,345
2,697
3,570
2,555
2,415
654
462
351
391
604
2,537
4,844
6,646
10,095
12,754
4,649
4,885
3,933
8,604
700
614
830
1,067
2,195
1,862
973
1,084
1,678
1,699
1,531
1,561
239
260
261
292
363
335
466
495
499
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
208
246
272
337
555
684
908
641
559
34
37
42
47
46
38
36
34
99
1,032
345
592
569
2,851
109
86
105
120
567
543
267
295
372
413
371
395
39
43
44
46
56
49
61
63
64
MREO
(%)
15
18
20
24
17
25
25
25
23
5
8
12
12
8
1
1
1
1
8
7
12
14
33
16
14
13
11
26
29
27
27
22
24
24
25
16
17
17
16
15
15
13
13
13
NdPr
(ppm)
199
237
261
321
529
655
872
609
530
31
34
39
44
43
35
30
29
79
973
324
564
536
2,732
102
81
100
114
536
507
245
273
345
381
341
361
35
40
42
43
53
45
57
59
60
DyTb
(ppm)
9
10
11
16
27
29
36
31
29
3
3
3
3
3
4
6
5
20
58
21
29
33
119
6
5
6
6
31
37
22
21
27
32
31
34
3
3
3
3
4
3
4
4
4
www.axelreelimited.com.au
info@axelreelimited.com.au
12
HoleID
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-010
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
ASX : AXL
ACN: 665 921 273
From
(m)
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
To
(m)
10
11
12
13
14
15
16
17
18
19
20
21
22
23
23.62
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Interval
(m)
5m @ 1,445ppm TREO
2.62m @ 4,067ppm
TREO
TREO
(ppm)
479
463
657
564
979
1,084
1,651
1,655
1,101
1,733
884
964
3,755
5,155
2,816
165
167
187
190
152
155
170
185
180
193
179
175
217
253
210
198
275
309
332
277
313
149
200
238
278
268
275
673
816
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
55
66
58
84
182
231
311
307
224
151
176
209
972
1,269
813
24
24
30
30
22
20
20
18
16
16
15
15
13
13
11
10
11
10
11
10
11
9
6
8
7
8
8
37
109
MREO
(%)
11
14
9
15
19
21
19
19
20
9
20
22
26
25
29
15
14
16
16
14
13
12
10
9
8
8
9
6
5
5
5
4
3
3
4
4
6
3
3
3
3
3
5
13
NdPr
(ppm)
51
61
55
79
172
217
295
291
210
141
166
197
916
1,190
767
21
21
27
27
19
17
17
16
14
14
13
13
11
11
9
8
9
8
9
7
8
7
5
6
5
7
6
35
105
DyTb
(ppm)
4
4
4
5
11
14
15
16
14
9
10
12
56
79
46
3
3
3
3
3
3
3
2
2
2
2
2
2
2
2
2
2
2
2
2
3
2
1
2
1
2
1
3
5
www.axelreelimited.com.au
info@axelreelimited.com.au
13
HoleID
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-011
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
ASX : AXL
ACN: 665 921 273
From
(m)
29
30
31
32
33
34
36.55
38
39
40
41
42
43
44
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
To
(m)
30
31
32
33
34
35.06
38
39
40
41
42
43
44
45.15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Interval
(m)
8.6m @ 3,432ppm
TREO
6.95m @ 3,922ppm
TREO
TREO
(ppm)
3,040
1,828
8,085
3,276
4,373
2,890
2,254
2,590
2,659
3,607
3,123
3,087
3,705
6,500
173
154
177
242
135
144
124
143
162
176
208
235
252
274
278
286
355
368
385
349
462
647
224
420
293
450
350
696
1,619
6,204
832 High St
Kew East VIC
Australia 3102
MREO
(ppm)
918
145
128
395
272
217
361
705
570
784
937
628
1,241
1,923
28
24
28
44
19
21
19
23
26
23
25
24
23
21
16
13
15
18
14
13
19
23
11
21
25
35
40
73
32
665
MREO
(%)
30
8
2
12
6
8
16
27
21
22
30
20
33
30
16
16
16
18
14
15
15
16
16
13
12
10
9
8
6
5
4
5
4
4
4
4
5
5
9
8
11
10
2
11
NdPr
(ppm)
881
136
114
378
259
207
346
667
542
742
903
601
1,196
1,850
26
22
25
41
17
19
17
22
24
21
23
22
21
19
15
12
14
16
12
11
17
21
9
20
24
33
38
67
30
650
DyTb
(ppm)
37
9
14
17
13
10
16
38
28
42
34
27
45
73
3
2
3
3
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1
2
2
2
2
5
3
15
www.axelreelimited.com.au
info@axelreelimited.com.au
14
HoleID
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
CLD-DDH-012
From
(m)
30
31
32
33
34
To
(m)
31
32
33
34
34.95
Interval
(m)
TREO
(ppm)
1,688
2,622
5,442
7,654
2,137
MREO
(ppm)
169
82
302
382
394
MREO
(%)
10
3
6
5
18
NdPr
(ppm)
165
78
293
370
381
DyTb
(ppm)
5
4
9
12
12
Table 3 – Caladão auger and diamond drill hole locations.
HoleID
Hole Type
Easting
Northing
RL (m)
EOH
Tenement
Target
CLD-AUG-091
Auger
235,034.30
8,113,248.10
858.35
15.00
831.458/2020
Area “A”
CLD-AUG-092
Auger
234,911.14
8,113,617.48
904.19
15.00
831.458/2020
Area “A”
CLD-AUG-093
Auger
236,245.07
8,112,559.37
822.43
15.00
831.458/2020
Area “A”
CLD-AUG-102
Auger
230,037.54
8,112,566.13
794.34
15.00
830.451/2023
Area “A”
CLD-AUG-103
Auger
230,977.74
8,109,346.21
863.26
13.00
830.451/2023
Area “A”
CLD-AUG-104
Auger
229,224.13
8,108,895.96
792.15
14.00
830.451/2023
Area “A”
CLD-AUG-105
Auger
230,630.05
8,109,343.69
867.05
15.00
830.451/2023
Area “A”
CLD-AUG-106
Auger
229,623.45
8,108,907.37
796.80
15.00
830.451/2023
Area “A”
CLD-AUG-107
Auger
229,638.77
8,108,402.61
823.22
15.00
830.451/2023
Area “A”
CLD-AUG-108
Auger
230,529.06
8,109,730.84
844.69
17.00
830.451/2023
Area “A”
CLD-AUG-109
Auger
229,191.56
8,108,568.31
782.19
11.00
830.451/2023
Area “A”
CLD-AUG-110
Auger
229,139.92
8,110,116.49
729.22
7.00
830.451/2023
Area “A”
CLD-AUG-111
Auger
234,255.07
8,111,754.02
721.27
16.00
831.458/2020
Area “A”
CLD-AUG-112
Auger
230,490.95
8,110,058.01
833.61
9.00
830.451/2023
Area “A”
CLD-AUG-113
Auger
232,644.98
8,111,644.55
711.82
15.00
831.458/2020
Area “A”
CLD-AUG-114
Auger
234,119.86
8,112,048.72
729.68
7.00
831.458/2020
Area “A”
CLD-AUG-115
Auger
230,685.51
8,110,420.75
871.13
15.00
830.451/2023
Area “A”
CLD-AUG-116
Auger
233,097.91
8,111,623.80
748.80
14.00
831.458/2020
Area “A”
CLD-AUG-117
Auger
233,924.79
8,111,604.07
720.69
12.00
831.458/2020
Area “A”
CLD-DDH-009
DDH
234,483.00
8,113,175.00
981.84
32.5
831.458/2020
Area “A”
CLD-DDH-010
DDH
234,253.00
8,112,823.00
932.11
26.9
831.458/2020
Area “A”
CLD-DDH-011
DDH
235,045.00
8,112,561.00
917.31
48.5
831.458/2020
Area “A”
CLD-DDH-012
DDH
232,392.00
8,113,699.00
938.29
37.1
831.458/2020
Area “A”
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
15
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done, this would be relatively simple
(e.g., ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverized to produce a 30 g charge for fire
assay’). In other cases, more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
Diamond drill holes
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Diamond drilling
Drilling
techniques
• The drilling utilizes a conventional wireline diamond
drill rig Mach 320-03, with HQ diameter.
• The core is collected in core trays with depth
markers at the end of each drill run (blocks).
• In the saprolite zone, the core is halved with a metal
spatula and bagged in plastic bags; the fresh rock was
halved by a powered saw and bagged
Auger holes
• At each drill site, the surface was thoroughly cleared.
Soil and saprolite samples were gathered every 1 meter
with precision, carefully logged and photographed. Each
sample was then sealed in plastic bags and clearly
labelled for identification.
• The drilling technique is a diamond drill rig Mach
320-03 with HQ diameter using the wireline technique.
• Each drill site was cleaned and leveled with a
backhoe loader.
• All holes are vertical.
• Drilling is stopped once the intersection with
unweathered basement intrusives is confirmed = +3 to
5m of fresh rock.
Auger drilling
• A motorized 2.5HP soil auger with a 4” drill bit,
reaching depths of up to 20 meters, was used to drill.
The drilling is an open hole, meaning there is a
significant chance of contamination from the surface
and other parts of the auger hole. Holes are vertical and
not oriented.
ASX : AXL
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
16
Criteria
JORC Code explanation
Commentary
Drill
sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Diamond drilling
• Core recoveries were measured after each drill run,
comparing the length of core recovered vs. drill depth.
Overall Core recoveries are 92.5%, achieving 95% in the
saprolite target horizon, 89% in the transitional rock
(fresh fragments in clay), and 92.5% in fresh rock.
Auger drilling
• No recoveries are recorded.
• No relationship is believed to exist between recovery
and grade.
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
an
Share your feedback
Discover