ASX ANNOUNCEMENT
ASX: AXL | FSE: HN8
29 July 2026
QUARTERLY ACTIVITIES & CASH FLOW REPORT
HIGHLIGHTS
Caladão REE-Gallium Project:
• Woolrich column leach testwork validated the ionic rare earth elements (REE) low-acid, low-cost,
sustainable in situ recovery (ISR) pathway using a mild magnesium sulphate solution
• CLT-01 recovered 560ppm soluble TREO with 39%magnet rare earth oxides (MREO), exceeding the
best previous diagnostic result, under lower strength reagent conditions
• Testing maintained a magnet-rich rare earth basket, including dysprosium (Dy) and terbium (Tb),
with very low impurity mobilisation, supporting the potential for simpler downstream processing
• The Woolrich ISR field exploratory test programme is planned to commence in the December
quarter 2026, with column testing generating the data required for its design
• Successful field testing would position Axel as a potential first-mover in commercial ISR REE
extraction in Minas Gerais, Brazil
Woolrich Deposit:
• Woolrich was selected for Axel’s inaugural ISR field trial, with pregnant leach solution (PLS) to be
supplied to Core Resources (Australia) for downstream MREC production
• Results support targeted MRE upgrade of Woolrich's 128Mt @ 1,013ppm TREO Mineral Resource
to Indicated confidence and will provide inputs for ISR wellfield design
Corporate:
• Dr Patience Mpofu (PhD in Mineral Processing) appointed Managing Director, bringing more than
25 years' resources sector experience, including executive roles at South32, Anglo American and
Sibanye-Stillwater
• Strong cash position with $5.7M cash on hand at quarter end
Axel REE Limited (ASX: AXL, “Axel” or “the Company”) provides its Quarterly Activities Report for the
quarter ended 30 June 2026.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
2
Figure 1. Caladão REE-Gallium Project area (415km²)
Exploration Activities for the Quarter
Caladão REE-Gallium Project
Woolrich Column Leach Testwork – Ionic REE ISR Development Pathway Validated
The Company's metallurgical programmes at the Woolrich deposit delivered further validation of its in-situ
recovery (ISR) development pathway during the quarter. Under dynamic, ISR-analogue flow conditions using
a mild magnesium sulphate (MgSO₄) solution at pH 4.0, up to 560ppm soluble TREO at 39% MREO was
recovered, exceeding the best result achieved during the earlier static diagnostic testwork programme.
The results exceeded the diagnostic benchmark under lower strength reagent conditions, while maintaining
a magnet-rich rare earth basket and very low impurity mobilisation, supporting Woolrich’s potential
suitability for ISR development. The metallurgical testwork is being conducted by Core Resources Pty Ltd
(Core), a specialist metallurgical laboratory in Brisbane with extensive REE leach testwork experience.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
3
CLT-01 recovered 560ppm soluble TREO at pH 4.0, a 14% increase on the base diagnostic case (LT02),under
lower strength reagent conditions. CLT-02, operated at the lower 0.125M reagent strength, recovered
494ppm soluble TREO, compared with 491ppm in the diagnostic base case.
Test TREO (ppm)
Relative to Diagnostic
Test (LT02)
MgSO₄ pH
LT02 (base diagnostic case) 491 100% 0.25M 4.0
LT05 (diagnostic) 533 109% 0.125M 4.0
LT07 (best diagnostic case) 546 111% 0.25M 3.5
CLT-01 560 114% 0.25M 4.0
CLT-02 494 101% 0.125M 4.0
Table 1. Soluble TREO from diagnostic and column leach testing on the Woolrich composite using magnesium
sulphate solution throughout. LT02 is the diagnostic base-case benchmark.
The results indicate that REE recovery is driven by solution throughput and ion-exchange equilibrium rather
than reagent strength. The ongoing column programme will further define the optimum reagent strength
required to maintain recovery while minimising PLS volumes – an important driver of operating cost for a
commercial ISR operation.
Impurity mobilisation remained very low throughout both column leach tests, with cumulative
aluminium below 2ppm, iron below 0.5ppm, thorium below 5.5ppm and uranium below 4ppm, supporting
the selectivity of magnesium sulphate leaching under the conditions tested. A high-value, magnet-rich
basket was maintained throughout, with CLT-01 and CLT-02 recovering approximately 39% and 37% MREO
respectively. This indicates that the magnet rare earths, including the heavy rare earths dysprosium (Dy) and
terbium (Tb), were recovered alongside the total rare earths under magnesium sulphate ISR conditions.
Figure 2. Column leach TREO recovery relative to the LT02 diagnostic benchmark.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
4
The highest diagnostic and column leach results achieved to date at Woolrich exceed the 486ppm soluble
TREO grade previously referenced by the Company from the operating Gerik ionic clay ISR operation in
Malaysia, while maintaining very low aluminium, iron, thorium and uranium mobilisation.
The CLT-01 and CLT-02 programmes have generated the first laboratory-derived ISR operating parameters
for Woolrich, including breakthrough behaviour,recovery kinetics, reagent response and solution chemistry.
The Woolrich ISR field exploratory test programme is planned to commence in the December quarter
2026, and the column test data will be used to optimise future column programmes and support its design.
A second pair of columns (CLT-03 and CLT-04) has commenced following the initial leach performance data
from CLT-01 and CLT-02.
Successful progressionthrough the fieldexploratory test programme could position Axelas a potential
first-mover in commercial ISR REE extraction in Minas Gerais, Brazil.
Woolrich Drilling Supports ISR Pathway and Resource Upgrade
During the quarter the Company reported assay results for 137 holes from its 258-hole infill and step-out
auger drilling programme at the 128Mt Woolrich ISR REE Deposit (refer ASX release 6 May 2026). The results
further define a laterally extensive and vertically developed ionic clay rare earth system across the selected
~2,000ha footprint. The 200m × 200m drill spacing was designed to support conversion of Woolrich's current
Inferred Mineral Resource of 128Mt @ 1,013ppm TREO to Indicated classification, while also providing
geological inputs for ISR wellfield design and leach domain definition.
Key highlights included:
• High-grade assays, including 1m @ 8,517ppm TREO (41% MREO) with 269ppm DyTb and 332ppm
Y₂O₃ in CLD-AUG-682, and key intercepts of 4m @ 3,740ppm TREO and 10m @ 3,055ppm TREO
• Thick, shallow intercepts, including 6m @ 3,324ppm TREOfrom 1m depth (CLD-AUG-748) and 12m
@ 2,552ppm TREO from 1m depth (CLD-AUG-779).Shallow mineralisation onset minimises wellfield
installation depth – a key economic driver for ISR operations
• HREE and Yttrium enrichment, with a signature more consistent with the high-value ionic clay
systems of southern China compared to the predominantly LREE-weighted Brazilian carbonatite or
alkaline intrusive-associated deposits,withpotential to enhance the value of a futureMREC product.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
5
Figure 3. Spatial distribution of TREO intercepts across the Woolrich Deposit, highlighting the broad
mineralised footprint defined by systematic drilling across approximately 2,000 hectares.
Mineralised intervals from the Woolrich drilling programme have been submitted to SGS for magnesium
sulphate leach testing. This work will help define soluble REE distribution, support leach domain modelling
and prioritise areas for future field-based studies. The Woolrich Indicated Mineral Resource upgrade
remains targeted for completion in 2026.
Woolrich Deposit Selected as Field Test Location for In Situ REE Recovery Programme
Early in the quarter, the 128Mt Woolrich ISR Deposit within Caladão Project Area B was selected as the
location for the Company's inaugural in situ recovery REE field test programme (refer ASX release 13 April
2026). Approximately 2 hectares have been defined within which the field test will be conducted, selected
on the basis of favourable geological, topographic and regolith characteristics – including low-relief
topography that supports gravity-assisted PLS drainage, a well-developed lateritic regolith profile over
coarse pegmatiticgraniteproviding suitable permeability for leachantdistribution,and bedrock immediately
below the ionic rare earth mineralisation expected to act as a natural hydraulic boundary.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
6
Figure 4. Woolrich Deposit first wellfield test area at Caladão – Area B.
The field test programme is designedto generate the operating parameters required for wellfield and process
design, including permeability response, reagent consumption, PLS tenor, recovery behaviour, hydraulic
control and impurity management under field conditions. PLS generated from the field tests will be supplied
to Core Resources (Australia) for downstream MREC production, evaluating the pathway from in situ
extraction to a potential saleable product. A multidisciplinary technical team covering mining/project
engineering, process engineering, environmental coordination, geology, hydrogeology and geotechnical
support is being assembled.
The potential environmental and capital advantages of the ISR approach remain subject to successful
completion of technical studies, leach testing, hydrogeological assessment, environmental review,
permitting, regulatory approvals and funding.
Gallium and Scandium Testwork
Core Resources continued to progress the gallium leach testwork programme during the quarter, evaluating
acid leach conditions for gallium extraction from Caladão material. Gallium has been subject to Chinese
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
7
export restrictions since 2023 and is a critical input for semiconductors and defence electronics. Caladão's
439Mt @ 38ppm gallium Inferred Mineral Resource is one of the largest discrete gallium inventories
reported globally and positions Axel as a potential non-Chinese source. Downstream recovery studies with
Core Resources to assess potential gallium and scandium product pathways are ongoing.
Caldas REE Project
Exploration Target Definition and Metallurgical Studies
Following completion of auger drilling across the North, Central, East and South prospects around the rim
of the Poços de Caldas alkaline caldera complex, the Company continued to integrate drilling and assay
data to define an initial Exploration Target for the Caldas REE Project in accordance with the JORC (2012)
Code. The Exploration Target is intended to provide an early indication of the potential scale of REE
mineralisation contained within the project's 228km² landholding.
Figure 5. Caldas Project.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
8
Corporate
Cash Position
The Company held $5.7M in cash at 30 June 2026.
Appointment of Managing Director
On 11 June 2026, the Company announced the appointment of Dr Patience Mpofu as Managing Director.
Dr Mpofu is a globally recognised mining executive, director and critical minerals strategist with more than
25 years' experience spanning metallurgy, mining operations, corporate strategy, capital markets, ESG and
stakeholder engagement in the resources sector.
Dr Mpofu holds a PhD in Mineral Processing and has deep technical expertise in clay-hosted mineral
systems and rare earth metallurgy, directly relevant to Axel’s planned ISR field exploratory test programme
at Woolrich. Her executive leadership experience includes senior roles with South32 Limited (ASX: S32),
Anglo American and Sibanye-Stillwater (formerly Lonmin Plc). She currently serves as a Non-Executive
Director of Orion Minerals Limited (ASX/JSE: ORN) and is Founder and CEO of Insight Mining Experts. Her
appointment supports Axel's transition from exploration toward technical and commercial development of
its rare earths and critical minerals portfolio. The material terms of her employment were set out in the
Company's ASX release of 11 June 2026.
ASX – Additional Information
5.3.1.
For the purpose of ASX Listing Rule 5.3.1, details of the Company’s exploration activities for the quarter,
including any material developments or changes in those activities, and a summary of the expenditure
incurred on those activities is set out in the relevant sections of this announcement. Total exploration
expenditure incurred during the period was approximately $477k.
5.3.2.
For the purpose of ASX Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company or its subsidiaries.
5.3.3.
For the purpose of ASX Listing Rule 5.3.3, details of the tenements held by the Company are set out at
Schedule 1. No mining tenements were acquired or disposed of during the quarter.
5.3.4.
For the purpose of ASX Listing Rule 5.3.4, a comparison of the use of funds as per the Axel REE Prospectus
dated 7 June 2024 (Prospectus) and actual use of funds since ASX admission is presented below:
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
9
Use of Funds
Prospectus Estimate
(2-year period following
admission)
($ million)
Actual use of funds until
30 June 2026
($ million) Variance
Exploration at the Projects 9.65 4.11 (5.54)
Expenses of the Offer 1.14 1.10 (0.04)
General and administration costs 2.51 2.81 0.30
Working capital 0.52 0.07 (0.45)
Total 13.82 8.09 (5.73)
The material variance relating to exploration expenditure was principally due to the following:
• The Company has reported Mineral Resource Estimates (MRE) for gallium and REE and significant
MRE upgrades during the period, completed advanced metallurgical testwork, and continued to
define further exploration targets whilst maintaining significant cost efficiencies
• The Company remains on track to meet its stated objectives under the Prospectus at costs below
the Prospectus Estimates
5.3.5.
For the purpose of ASX Listing Rule 5.3.5, the Company made payments of approximately $143k to related
parties and their associates. These payments include directors’ fees/salaries and superannuation
contributions, and company secretary fees.
This announcement was authorised by the Board of Directors.
For enquiries regarding this release please contact:
Axel REE Limited
P: +61 3 9249 9859
E: investors@axelreelimited.com.au
Gabriella Hold
The Capital Network
P: +61 2 7257 7338
E: gaby@thecapitalnetwork.com.au
Julia Maguire
The Capital Network
P: +61 2 7257 7338
E: julia@thecapitalnetwork.com.au
About Axel REE
Axel REE is a critical minerals exploration company which is primarily focused on developing the Caladão REE-Gallium
and Caldas REE Projects in Brazil, the second largest country globally in terms of REE reserves.
Axel is advancing a low-cost, modular development concept at Caladão based on in situ recovery (ISR) of ionic clay-
hosted rare earth mineralisation using magnesium sulphate leaching. This approach aims to minimise surface
disturbance and capital intensity by deploying modular hydrometallurgical plants within wellfields. In parallel, Axel is
progressing metallurgical programs to unlock additional value from gallium and scandium within the near-surface
oxidised profile.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Caladão Project – Area A Inferred 233Mt @ 2,133ppm TREO
Marambaia – Area B Inferred 126Mt @ 1,154ppm TREO
Tiger Creek – Area B Inferred 85Mt @ 1,050ppm TREO
Woolrich – Area B Inferred 128Mt @ 1,013ppm TREO
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
10
Inferred Rare Earth Elements MRE Area A & Area B for a total MRE tonnage of 572Mt.
JORC 2012 Mineral Resource Deposit JORC 2012 Classification Tonnes and Grade
Caladão Project – Area A Inferred 100Mt @ 42.0ppm Gallium
Caladão Project – Area B Inferred 339Mt @ 36.6ppm Gallium
Inferred Gallium MRE Area A & Area B for a total MRE tonnage of 439Mt.
Map of Axel REE key projects in Brazil
Competent Persons Statement
The information in this announcement that relates to Exploration Results and Metallurgical Test Work is based on and
fairly represents information and supporting documentation compiled by Mr Antonio de Castro, BSc (Hons), MAusIMM,
CREA who acts as Axel´s Senior Consulting Geologist through the consultancy firm, ADC Geologia Ltda. Mr. de Castro
has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the reporting of exploration results and analytical and metallurgical test work he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (the JORC Code). Mr de Castro consents to the inclusion in the announcement of the
matters based on his information in the form and context in which it appears.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
11
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the
Company. These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ
materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from anticipated in such information. These and all subsequent written and oral forward-looking information
are based on estimates and opinions of management on the dates they are made and expressly qualified intheir entirety
by this notice. The Company assumes no obligation to update forward-looking information should circumstances or
management’s estimates or opinions change.
Reference to Previous Announcements
The information in this announcement that relates to exploration results is extracted from:
• AXL ASX release 22 June 2026, “Axel Validates Ionic REE ISR Development Pathway”
• AXL ASX release 6 May 2026, “Woolrich Drilling Supports ISR Pathway and Resource Upgrade”
• AXL ASX release 20 April 2026, “REE ISR Column Testing Achieves Flow-Through Milestone”
• AXL ASX release 13 April 2026, “ISR REE Field Trial Area Selected at Woolrich Deposit”
• AXL ASX release 23 December 2025, “Axel MRE Delivers 145% REE Growth and 339% Gallium Growth”
• AXL ASX release 26 November 2025, “Breakthrough REE Metallurgy at Caladao In Situ Leach Target”
The Company confirms that it is not aware of any other new information or data that materially affects the information
contained in these announcements and, in the case of estimates of mineral resources, that all material assumptions
and technical parameters underpinning the estimates in the announcements continue to apply and have not materially
changed.
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
12
Schedule 1 – Tenements at 30 June 2026
Tenement
Number Area (ha) Holder Location Interest Expiry Date
830500/2023 1460.5 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830882/2023 8.12 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830883/2023 57.57 Axel REE Ltda Minas Gerais 100% Application pending
830886/2023 47.58 Axel REE Ltda São Paulo 100% Granted/Renewal pending
830888/2023 7.77 Axel REE Ltda São Paulo 100% Granted/Renewal pending
830889/2023 442.8 Axel REE Ltda São Paulo 100% 28-Feb-2027
830890/2023 363.73 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830891/2023 5.63 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830893/2023 24.65 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
820286/2023 16.56 Axel REE Ltda Minas Gerais 100% 26-Oct-2026
820287/2023 899.49 Axel REE Ltda Minas Gerais 100% 26-Oct-2026
820319/2023 1603.14 Axel REE Ltda Minas Gerais 100% 26-Sep-2026
830082/2023 1549.63 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830083/2023 1995.5 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830084/2023 1327.5 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830085/2023 1454.03 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830451/2023 1919.96 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830452/2023 148.72 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830453/2023 1502.79 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830454/2023 1299.51 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830455/2023 1227.51 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830456/2023 1080.58 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830457/2023 1317.8 Axel REE Ltda Minas Gerais 100% 14-Oct-2027
830458/2023 1714 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830459/2023 1599.56 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830460/2023 1435.97 Axel REE Ltda Minas Gerais 100% 11-Mar-2028
830461/2023 1914.17 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830462/2023 1978.71 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830463/2023 1917.61 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830464/2023 1991.16 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830465/2023 1912.78 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830466/2023 1968.93 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830467/2023 826.86 Axel REE Ltda Minas Gerais 100% 20-Sep-2027
830468/2023 910.99 Axel REE Ltda Minas Gerais 100% 20-Sep-2027
830469/2023 1972.5 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830505/2023 1033.42 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830506/2023 786.64 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830515/2023 1963.87 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830516/2023 1947.1 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830527/2023 386.89 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830880/2023 357.8 Axel REE Ltda Minas Gerais 100% Application pending
ASX: AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
13
Tenement
Number Area (ha) Holder Location Interest Expiry Date
830881/2023 32.34 Axel REE Ltda Minas Gerais 100% Application pending
830884/2023 24.43 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
830885/2023 695.36 Axel REE Ltda Minas Gerais 100% Application pending
830887/2023 25.17 Axel REE Ltda São Paulo 100% 28-Feb-2027
830895/2023 102.82 Axel REE Ltda São Paulo 100% 28-Feb-2027
831084/2023 1950.77 Axel REE Ltda São Paulo 100% Granted/Renewal pending
831086/2023 1886.07 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
831087/2023 1998.07 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
831088/2023 1956.82 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
831089/2023 1983.83 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
831090/2023 1333.64 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
831092/2023 1085.01 Axel REE Ltda Minas Gerais 100% Granted/Renewal pending
833340/2023 936.03 Axel REE Ltda Minas Gerais 100% Application pending
833341/2023 1130.7 Axel REE Ltda Minas Gerais 100% Application pending
831458/2020 1574.47 Axel REE Ltda Minas Gerais 100% 27-Nov-2027
831515/2020 884.39 Lobo Guara Mineracao e
Representacao Eireli1
Minas Gerais 100% 10-Oct-2028
831383/2025 43.24 Lobo Guara Mineracao e
Representacao Eireli1
Minas Gerais 100% 10-Oct-2028
831384/2025 42.10 Lobo Guara Mineracao e
Representacao Eireli1
Minas Gerais 100% 10-Oct-2028
831524/2020 1023.9 Foxfire Metals Ltda1
Minas Gerais 100% Granted/Renewal pending
1
100% beneficial interest in the mineral rights (other than lithium) in the REE Tenements was assigned to the Company.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AXEL REE LIMITED
ABN Quarter ended (“current quarter”)
50 665 921 273 30 JUNE 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
12 months
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(477) (1,972)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (46) (130)
(e) administration and corporate costs (354) (1,371)
1.3 Dividends received (see note 3) - -
1.4 Interest received 45 398
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (GST refunds) 13 95
1.9 Net cash from / (used in) operating
activities
(819) (2,980)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
12 months
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
- -
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
- -
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
6,553 8,714
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(819) (2,980)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
- -
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
- -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
12 months
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
5,734 5,734
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 5,734 6,553
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (Term Deposits) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
5,734 6,553
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
(143)
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Refer section 5.3.5 of quarterly activity report for further explanation of related party payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
N/A
8. Estimated cash available for future oper
Share your feedback
Discover