Axel MRE Delivers 145% REE Growth and 339% Gallium Growth
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX: AXL | FSE: HN8
23 December 2025
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
District Scale Caladão REE andGalliumMRE Growth
572Mt@1,506ppmTREO(145%Increase)and
439Mt@ 38ppm Ga(339%Increase)
HIGHLIGHTS
• Maiden Area B Mineral Resource Estimate 339Mt @ 1,075ppm TREO and 36.6ppm Gallium
(JORC 2012), using 500ppm TREO cut-off
• Combined Area A and Area B MRE now totals 572Mt @ 1,506ppm TREO and 439Mt @
38ppm Ga, covering ~151km2
(only ~35% of total Caladão area) and positioning the
Caladão Project as a district scale REE project and one of the largest discrete Gallium
deposits in the world
• Magnet rare earths exposure with NdPr and DyTb assemblage supporting high-value
basket for future Mixed Rare Earth Carbonate (MREC) production
• Proven Leachability at Woolrich ISL deposit achieved 464ppm soluble TREO via
magnesium sulphate leach - comparable to profitable Asian ISL operations
• Strategic advantage in Brazil’s Lithium Valley with established infrastructure and dual
commodity endowment (REE + Gallium)
• Upcoming leach test results across all drillholes will underpin a new resource estimate
focused on soluble rare earths, a critical step toward designing and validating the in situ
recovery trial mine planning
• Next steps include infill drilling and soluble-REE testwork planned to advance scoping
study for modular in situ recovery operations in 2026
Non-Executive Chairman, Paul Dickson, commented:
“Delivering this Area B Mineral Resource represents a major milestone for Axel and
marks a significant step forward in unlocking the full potential of the Caladão Project.
The combined global MRE of 572Mt TREO and 439Mt gallium underscores the scale of
this district-sized opportunity that positions Caladão amongst the largest ionic clay REE
projects and as one of the largest gallium projects globally.
This achievement is the result of close collaboration between our technical team and
resource consultants, leveraging enhanced geological understanding and metallurgical
insights. Importantly, early leach test work has confirmed strong amenability to in-situ
recovery using magnesium sulphate, a proven low-cost method in Asia, which could
transform the economics of development.
From a project development perspective, we are highly encouraged. The resource
provides a robust foundation for our upcoming scoping studies, which will incorporate
soluble-REE data to optimize design for modular in-situ leach operations. With magnet
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
rare earths (NdPr and DyTb) representing a significant portion of the basket value,
Caladão is strategically positioned to supply critical materials for global technology and
energy markets.
Looking ahead, our focus remains on accelerating value creation through infill drilling,
expanded leach test work, and hydrological assessments to define priority zones for trial
mining in 2026. Based on recent results, we believe Caladão offers exceptional upside
and the potential to become a cornerstone asset in the global rare earth and gallium
supply chains.”
Axel REE Limited (ASX: AXL, FSE:HN8, Axel or the Company) is pleased to announce a maiden JORC (2012)
Inferred Mineral Resource (MRE) for Area B at the Caladão REE–Gallium Project in Minas Gerais, Brazil. The
Company has delivered a maiden Area B Inferred MRE of 339Mt @ 1,075ppm TREO and 36.6ppm gallium
(using a 500ppm TREO cut-off). The combined Area A and Area B rare earth elements (REE) inventory now
totals 572Mt @ 1,506ppm TREO (145% increase). The upgrade materially increases the scale of the
Caladão Project and strengthens the pathway toward in situ leach development. The update also expands
the Project’s gallium inventory to a combined Inferred total of 439Mt @ 38ppm Ga (339% increase),
reflecting the dual-commodity endowment across the Caladão system.
Table 1: Mineral Resource Estimate Summary – Area B
Deposit
JORC
Category
Tonnes
(Mt)
TREO
(ppm)
Gallium
(ppm)
NdPr
(ppm)
DyTb
(ppm)
MREO
(ppm)
Marambaia Inferred 126 1,154 35.8 261 12.9 274
Tiger Creek Inferred 85 1,050 40.1 117 8.0 125
Woolrich Inferred 128 1,013 35.1 179 10.9 190
Total (Area B) MRE Inferred 339 1,075 36.6 194 10.9 205
Sources: GE21, 2025
Notes:
1. TREO = total rare earth oxides (CeO2, Dy2O3, Er2O3, Eu2O3, Gd2O3, Ho2O3, La2O3, Lu2O3, Nd2O3, Pr6O11, Sm2O3, Tb4O7, Tm2O3, Yb2O3)
+ Y2O3.
2. NdPr = Pr6O11+Nd2O3.
3. DyTb = Dy2O3 + Tb2O3.
4. MREO = Magnetic Rare Earth Oxide (Nd2O3, Pr6O11, Tb4O7, Dy2O3)
5. HREO = Heavy Rare Earth Oxide (Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Y2O3, Lu2O3)
6. LREO = Light Rare Earth Oxide (La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3)
7. Totals may not balance due to rounding of figures.
8. Mineral Resources are not Mineral Reserves, as they do not have demonstrated economic viability. The estimate of Mineral Resources may be
materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant factors.
9. Mineral Resources were classified as Inferred.
10. Blocks estimated by ordinary kriging at support of 100 m × 100 m × 5 m with sub-blocks 25 m × 25 m × 2.5 m.
11. The results are presented in situ and undiluted, are constrained within an optimised open pit shell, and are considered to have reasonable
prospects of economic viability using the following parameters:
(a) Pit slope angle: 25°;
(b) Basket price: USD 54.20 /kg REO;
(c) Costs: mining: 1.60 US$/t mined; process: 7.23 US$/t processed; royalties: 2% of revenue;
(d) Metallurgical Efficiencies estimated by element.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Table 2: Inferred REE MRE Area A & Area B for a total MRE of 572Mt
Deposit
JORC
Category
Tonnes
(Mt)
TREO
(ppm)
Caladão Area A Inferred 233 2,133
Caladão Area B Inferred 339 1,075
Total (Global) MRE Inferred 572 1,506
Table 3: Inferred Gallium MRE Area A & Area B for a total MRE of 439Mt
Deposit
JORC
Category
Tonnes
(Mt)
Ga
(ppm)
Caladão Area A Inferred 100 42
Caladão Area B Inferred 339 36.6
Total (Global) MRE Inferred 439 38
The maiden Area B resource is distributed across three deposits - Marambaia, Tiger Creek and Woolrich,
demonstrating rare earth mineralisation at district scale and providing multiple potential development fronts
over the broader Caladão Project area.
In Area B, Marambaia contributes 126Mt @ 1,154ppm TREO and 35.8ppm Ga, Tiger Creek contributes 85Mt
@ 1,050ppm TREO and 40.1ppm Ga, and Woolrich contributes 128Mt @ 1,013ppm TREO and 35.1ppm Ga,
for a total Area B Inferred resource of 339Mt @ 1,075ppm TREO and 36.6ppm Ga.
This broad, multi-deposit footprint complements Area A and supports the Company’s view of Caladão as a
district-scale clay-hosted REE and gallium system within Minas Gerais’ Lithium Valley.
The scale increase is strategically important because it improves the optionality to optimise development
around the most value-accretive recovery pathway, including an in situ leach approach. The Company’s
stated development thesis is supported by both the mineral assemblage and the emerging metallurgical
evidence, with the magnet rare earth exposure (NdPr and DyTb) being a key contributor to basket value and
supportive of future mixed rare earth carbonate (MREC) production.
In addition, the inclusion and growth of gallium inventory alongside REE mineralisation reinforces Caladão’s
positioning as a dual-commodity critical minerals project.
About the Caladão REE-Gallium Project
The Caladão REE-Gallium Project is Axel REE’s flagship clay‐hosted rare earths and gallium project in the
Lithium Valley of Minas Gerais, Brazil (Figure 1). The tenure covers ~430 km² across two priority targets, Area
A and Area B. Drilling and sampling to date have outlined a mineralised footprint of ~151 km², representing
~35% of the Project area, with consistent near-surface REE and gallium grades across both areas.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Initial test work by ANSTO has confirmed ionic adsorption clay REE that desorb under ammonium sulphate
and NaCl leach conditions, with additional acid-leach tests indicating gallium recoverability for Area A.
Systematic leach tests at SGS with magnesium sulphate in drillholes at the Woolrich deposit in Area B
showed outstanding ionic rare earths values compatible with in situ leach (ISL) operations in Asia, triggering
the selection of it for in situ leach under a proposed trial mining to provide technical and economic
parameters for a scoping study based on modular in situ leach operations across the Caladão project.
All drill holes in the Caladão project will be subject to magnesium leach tests at SGS to select the additional
areas for follow up and infill drilling to define the most amenable areas for ISL by magnesium sulphate, an
environmentally friendly leachate now used in most of in situ operations in China, replacing ammonium
sulphate.
Figure 1. Location of the Caladão project in Brazil
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Caladão is positioned within an established critical minerals district that hosts operating and advanced
lithium projects, including Sigma Lithium’s Grota do Cirilo operation near Araçuai/Itinga, Atlas Lithium’s
Minas Gerais (Salinas) projects, and Pilbara Minerals Limited’s (ASX:PLS) Colina deposit, benefitting from
the region’s power, road and services infrastructure developed for battery-materials supply chains.
The project’s scale, dual commodity endowment and district location provide a strategic platform for
continued resource definition and metallurgical de-risking.
Rare Earth Elements Mineral Resource Estimate Summary
The Caladão Project comprises a portfolio of areas, of which, part of it has been drilled with an initial MRE
for REE and gallium already defined at Area A (refer ASX releases 22 August 2025 and 1 October 2025) The
Marambaia, Tiger Creek and Woolrich deposits at Area B are now the subject of this additional Mineral
Resource Estimate. The estimates are based on the validated drilling data provided by the Company to Ge21
Consultoria. A 500ppm TREO cut-off was estimated from total geochemical assays (fusion + ICP) and
constrained by an optimised pit shell applied solely to demonstrate reasonable prospects for eventual
economic extraction (RPEEE).
A total of 355 auger holes were completed in at Area B, totalling 4,416.5 m. The exploration campaigns were
carried out in 2023, 2024, and 2025. The drilling procedures were adequate for this purpose, the geological
modelling was executed by GE21 using Leapfrog® software version 2024.1. The domains modelled were Soil
(SOIL), Lateritic soil (LTS), Upper saprolite (USAP), lower saprolite (LSAP) and the fresh rock (FRC).
Mineral Resources are reported as an Inferred Resource using the economics cut-offs of 500ppm in TREO,
and Gallium as a co-product, constrained by an optimized pit shell. A summary is provided in the JORC Table
1.
Rare Earth Elements MRE – Further Information
The Caladão Area B project is divided in the Marambaia, Tiger Creek and Woolrich deposits. The Caladão
project is situated within the Eastern Brazilian Pegmatite Province (EBP), commonly known as the ‘Lithium
Valley’, specifically in the G5 supersuite (Padre Paraíso Charnockite and Caladão granite).
The project area is characterized by a tropical climate, with vegetation comprising low grasses and remnant
patches of tropical forest. The local economy has been supported by agriculture and livestock. In addition,
the region hosts active artisanal mining operations ('garimpos') for gemstones such as topaz and
aquamarine.
The project is located approximately 543 km from Belo Horizonte, the capital of Minas Gerais State. The area
can be accessed by road via highways BR-381 and BR-116. Alternatively, the site can be reached by air to the
Governador Valadares airport, followed by 236 km on BR-116 to the municipality of Padre Paraíso. There are
also non-regular commercial flights to the city of Teófilo Otoni, located approximately 100 km from Padre
Paraíso (Figure 2).
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Figure 2. Caladão Project areas.
Drilling
The Drilling activities conducted between 2023 and 2025 at the Caladão Project are summarized in Table 4.
The dataset includes a total of 355 auger drillholes. Figure 3. presents a base map of the spatial distribution
of the drillholes, illustrating the overall coverage and targeting strategy implemented across the project area.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Deposit Drilling Type Nº Holes Length (m)
Marambaia Auger 64 812
Tiger Creek Auger 227 2,967
Woolrich Auger 64 637.5
Total 355 4,416.5
Table 4. Summary of completed drilling at the Caladão Project area B
Figure 3. Map showing the auger drillings in the Marambaia, Tiger Creek and Woolrich deposits in
the Caladão Project.
The assay database comprises a total of 4,295 sample results. Auger samples range between 1 and 2 meters
in length.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Additional information
Selected auger holes from the Woolrich deposit were leached at SGS by magnesium sulphate at Ph 4.5 to
desorb the ionic REE (refer ASX release 25 November 2025 “Breakthrough REE Metallurgy at Caladao In Situ
Leach Target”).
The leaching results of 464ppm soluble TREO for Woolrich with soluble TREO grades are comparable to the
486ppm soluble TREO resource grade reported at the Gerik In Situ Leaching (ISL) REE mine in Perak State,
Malaysia, a simple, profitable ionic adsorption clay (IAC) rare earth operation.
The leach solutions display a high proportion of MREO, with MREO representing approximately 42% of
soluble TREO and NdPr averaging around 40% of soluble TREO (refer Table 5). This magnet-rich assemblage
compares favourably with peer IAC projects and supports the potential to produce a high-value MREC
product from future development, with strong exposure to NdPr and meaningful DyTb contributions to the
basket value.
A comparison of the Woolrich ISL deposit’s soluble TREO and MREO assemblage with selected IAC and ISL
peers, including the Gerik ISL REE mine and several advanced scoping and prefeasibility-stage projects
(EMA, Colossus, Caldera and Carina), is provided in Table 5 below.
Company – Project
CAPEX
(USD
Million)
SOLUBLE
TREO
(ppm)
MREO/
TREO (%)
NdPr/
TREO (%)
DyTb/
TREO (%)
Axel REE – Caladão Project, Woolrich ISL - 464 42.0 40.0 2.0
MCRE Resources/Southern Alliance Mining -
Gerik ISL REE Mine
20 486 30.01
27.0 3.0
Brazilian Critical Minerals (ASX:BCM) – EMA
Project
55 - 41.52
40.6 0.9
Viridis Mining (ASX:VMM) – Colossus Project 358 - 39.03
37.5 1.4
Meteoric Resources (ASX:MEI) – Caldera
Project
443 - 31.64
30.6 1.0
Aclara Resources (TSX: ARA) – Carina Project 680 459 31.55
27.4 4.1
Table 5. Soluble MREO in Woolrich deposit standing out in respect to the peers.
Note: all rare earths in solution will report in the final product, the Mixed Rare Earth Carbonate (MREC)
1
Euroz Hartleys article published dated 30 October 2025 ‘Malaysian ISL REE Site Visit’, link.
2
ASX: BCM Announcement dated 17th
December 2025 ‘EMA Field Trial Solutions produce MREC containing 52.5% TREO’.
3
ASX: VMM Announcement dated 24 September 2024 ‘Colossus Maiden Mixed Rare Earth Carbonate (MREC) Product’.
4
ASX: MEI Announcement dated 29 February 2024 ‘First Mixed Rare Earth Carbonate (MREC) Produced for Caldeira REE Project’.
5
TSX:ARA Announcement dated 06 November 2025 ‘Aclara Announces Filing and Results of PRE-Feasibility Study For Its Flagship
Carina Project’.
The Woolrich leach results shows a clear path to in situ leach by magnesium sulphate for the Caladão project
as it also retains a range of physical and geological parameters considered favourable for an ISL operation.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Next Steps
The Company will prioritise the workstreams required to progress Caladão from a district-scale Mineral
Resource to a technically and economically validated in situ recovery (ISR) development pathway. The
immediate focus is to expand the metallurgical dataset by completing systematic magnesium sulphate
leach testing across the broader Caladão drillhole database at SGS, using the resulting soluble-REE data to
identify priority areas for follow-up and infill drilling and to delineate zones considered suitable for
magnesium sulphate ISR approaches applied in Asia. This soluble-REE dataset is intended to underpin a
subsequent Mineral Resource framework focused on soluble rare earths and provide the technical inputs
required to advance ISR design parameters beyond total grade reporting.
In parallel, the Company will undertake targeted infill drilling and sampling over priority areas to increase
geological and metallurgical confidence at the scale required for ISR planning, including confirming
continuity, collecting additional material for leach optimisation, and characterising solution chemistry.
These programs are intended to feed directly into a 2026 scoping study for modular ISR operations,
translating metallurgical outcomes into an engineering design basis, while continuing to integrate prior
ANSTO desorption work (ammonium sulphate and NaCl) and gallium recoverability testwork together with
SGS Woolrich outcomes that have already informed trial zone selection.
To support field validation in 2026, the Company aims to complete the key studies and wellfield design
needed to run a controlled ISR field trial, alongside required approvals and environmental planning. The trial
will also include downstream processing work to convert the recovered leach solution into a saleable MREC.
Caladão’s location in Brazil’s Lithium Valley, with established road, power and services infrastructure, is
expected to support efficient execution of these activities.
This announcement was authorised by the Board of Directors.
For enquiries regarding this release please contact:
Axel REE Limited Investor & Media Relations
investors@axelreelimited.com.au awillis@nwrcommunications.com.au
About Axel REE
Axel REE is an exploration company which is primarily focused on exploring the Caladão REE-Gallium and Caldas REE
Projects in Brazil the third largest country globally in terms of REE Reserves. Axel hosts two discrete Inferred Mineral
Resource Estimates for Gallium (439Mt Ga) and Rare Earth Elements (572Mt REE).
The Company’s mission is to explore and develop REE and other critical minerals in vastly underexplored Brazil. These
minerals are crucial for the advancement of modern technology and the transition towards a more sustainable global
economy. Axel’s strategy includes extensive exploration plans to fully realize the potential of its current projects and
seek new opportunities.
Competent Persons Statement
The information in this announcement that relates to the Caladão Gallium and Rare Earths Mineral Resource is based
on and fairly represents information compiled by Mr. Antonio de Castro (acts as AXEL´s Senior Consulting Geologist
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
through the consultancy firm, ADC Geologia Ltda) and Mr. Leonardo Rocha (associate of GE21 Consultoria Mineral
Ltda). Mr. de Castro is a member of the Australasian Institute of Mining and Metallurgy, and Mr. Rocha is a member of
Australasian Institute of Geoscientists. Both have sufficient experience of relevance to the styles of mineralisation and
types of deposits under consideration, and to activities undertaken to qualify as Competent Persons as defined in the
2012 Edition of the Joint Ore Reserve Committee (JORC) AustralasianCode for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr. de Castro is the Competent Person for the geological and mineralization model
database (including all drilling information). Mr. Rocha is the Competent Person for the construction of the 3D
geology/mineralisation model plus the mineral resource estimation. Mr Leonardo Rocha undertook a site visit to the
Caladão Project between 11th
to 13th
November 2025. Mr de Castro has planned, managed and/or conducted work
programmes for the Caladão Project, including drilling. He has visited the site on numerous occasions. Mr. de Castro
and Mr. Rocha consent to the inclusion in this report of the matters on their information in the form and context in which
they appear.
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the
Company. These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ
materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from anticipated in such information. These and all subsequent written and oral forward-looking information
arebased onestimatesand opinions ofmanagement onthedates they aremadeand expressly qualified intheirentirety
by this notice. The Company assumes no obligation to update forward-looking information should circumstances or
management’s estimates or opinions change.
Reference to Previous Announcements
In addition to new results reported in this announcement, the information that relates to previous exploration results is
extracted from:
• AXL ASX release 19 July 2024 “Replacement Prospectus”
• AXL ASX release 30 October 2024 “Up to 12,931ppm TREO from first DD Hole at Flagship Caladao”
• AXL ASX release 27 November 2024 “Exceptional TREO and MREO Intercepts Continue at Caladao”
• AXL ASX release 3 December 2024 “Widespread High Grade REE Confirmed from Caladao Channelling”
• AXL ASX release 11 December 2024 “28,321ppm TREO / 7,606ppm MREO Make Record Grades at Caladao”
• AXL ASX release 17 December 2024 “Significant Gallium Mineralisation at Caladao Project”
• AXL ASX release 20 January 2025 “68% Increase In Mineralised Drilled Area at Flagship Caladao”
• AXL ASX release 19 March 2025 “Thick, High Grade REE and Ga Intercepts Continue at Caladao”
• AXL ASX release 6 May 2025 “Strong Gallium and REE Intercepts Continue at Caladao”
• AXL ASX release 10 June 2025 “Exceptional Gallium Mineralisation Continues into Area B”
• AXL ASX release 16 July 2025 “High Grade Gallium Intercepts Continue at Caladao Project”
• AXL ASX release 30 July 2025 “Ionic Clays Confirmed From Initial Met Tests at Caladao”
• AXL ASX release 22 August 2025 “100Mt Maiden Gallium Mineral Resource Estimate”
• AXL ASX release 9 September 2025 “Further REE-Gallium Mineralisation Identified at Caladao”
• AXL ASX release1October 2025 “REE Mineral Resource Estimate”
• AXL ASX release 25 November 2025 “Breakthrough REE Metallurgy at Caladao In Situ Leach Target”
The Company confirms that it is not aware of any new information or data that materially affects the information
contained in these announcements and, in the case of estimates of mineral resources, that all material assumptions
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
and technical parameters underpinning the estimates in the announcements continue to apply and have not materially
changed.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Appendix 2 – The following Table and Sections are provided to ensure compliance with JORC
Code (2012 Edition)
JORC (2012) Table 1 - Section 1: Sampling Techniques and Data
Item JORC code explanation Comments
Sampling
Techniques
• Nature and quality of sampling
(eg cut channels. random
chips. or specific specialised
industry standard
measurement tools
appropriate to the minerals
under investigation. such as
down hole gamma sondes. or
handheld XRF instruments.
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
• Include reference to measures
taken to ensure sample
representativity and the
appropriate calibration of any
measurement tools or
systems used.
• Aspects of the determination
of mineralisation that are
Material to the Public Report.
• In cases where ‘industry
standard’ work has been done
this would be relatively simple
(eg ‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg was
pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may
be required. such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralisation types (eg
submarine nodules) may
warrant disclosure of detailed
information.
• Holes were sampled using a powered auger drill machine
(open hole) conducted by Axel Ree exploration team for
2023, 2024 and 2025 auger drilling campaign.
• Sampling was executed by Axel Ree technical team for
2023, 2024 and 2025 drilling campaign.
• Every 1-metre sample was collected in a raffia bag in the
field and transported to the exploration shed to be dried in
the sun prior to despatch to SGS laboratory.
• Mineralisation is correlated to the Caladão Granite,
controlled by differentiation on the weathering profile.
• Samples were integrally sent to SGS laboratory for
preparation and analysis. Preparation rejects were
returned to the exploration shed and stored.
• 2 certified coarse blank sample, 2 certified reference
material (standard) samples and 2 field duplicate samples
were inserted into the sample sequence for each 50
samples batch.
Drilling
Techniques
• Drill type (eg core. reverse
circulation. open-hole
hammer. rotary air blast.
auger. Bangka. sonic. etc) and
details (eg core diameter.
triple or standard tube. depth
of diamond tails. face-
sampling bit or other type.
• Auger drilling was completed by a handheld-mechanical
auger with a 3” diameter auger bit. The drilling is an open
hole. meaning there is a significant chance of
contamination from surface and other parts of the auger
hole. Holes are vertical and not oriented.
• The maximum depth achieved with the powered auger was
25m. Deep auger holes (> 15m) are only achievable if
fragments of rocks/boulders etc. sitting within the
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
info@axelreelimited.com.au
Item JORC code explanation Comments
whether core is oriented and if
so. by what method. etc).
weathered profile and/or the water table are not in the
drillhole path. Auger drilling advances were measured
using a measuring tape.
Drill Sample
Recovery
• Method of recording and
assessing core and chip
sample recoveries and results
assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists
between sample recovery and
grade and whether sample
bias may have occurred due to
preferential loss/gain of
fine/coarse material.
• No recoveries were recorded.
• The operator observes the volume of each metre and notes
any discrepancy.
• When recovery is visually discrepant in two sequential one
metre interval, the field crew stops the drill hole.
• No relationship is believed to exist between recovery and
grade.
Logging
• Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation. mining studies
and metallurgical studies.
• Whether logging is qualitative
or quantitative in nature. Core
(or costean. channel. etc)
photography.
• The total length and
percentage of the relevant
intersections logged.
• All holes from 2023, 2024 and 2025 drilling campaign were
logged by Axel Ree geologists. Logging for both campaigns
detailed the geology, weathering, texture and any
geological observations. Care was taken to identify
transported cover from in-situ saprolite/clay zones and the
moisture content. Logging was done to a level that
supports a Mineral Resource Estimate.
• The auger drilling database received comprises 4416.50
meters drilled and logged.
Sub-
Sampling
Techniques
and
Sampling
Procedures
• If core. whether cut or sawn
and whether quarter. half or all
core taken.
• If non-core. whether riffled.
tube sampled. rotary split. etc
and whether sampled wet or
dry.
• For all sample types. the
nature. quality and
appropriateness of the sample
preparation technique.
• Quality control procedures
adopted for all sub-sampling
stages to maximise
representativity of samples.
• Measures taken to ensure that
the sampling is representative
• Auger sampling procedure is completed at the exploration
shed in Padre Paraíso – MG.
• The auger samples were collected in the site. The 3 until 5
advances with approximately 0.30-0.40 meter were placed
in a clean tarp, and when the interval is complete
(approximately 1 meter) the assistant put part of the
sample in a chip box and the remaining material into a pre-
labelled sample bag. No sample splitting (field duplicates
excepted) was conducted at site or at the exploration shed.
The whole sample was sent to the laboratory.
• For each 50 sample batches 1 sample was split at site to
obtain a field duplicate.
• S
Share your feedback
Discover