Highlights
• Noeber Orsine commenced as Operations Manager, Brazil, bringing more than 25
years’ mining project development, delivery and operational leadership
experience.
• Mr Orsine has held senior roles with ASX-listed and international resources
companies, including:
o Serra Verde (acquired by USA Rare Earth, Nasdaq: USAR, in 2026 for
approximately US$2.8 billion)
o Latin Resources (acquired by PLS Group, ASX: PLS, in 2025 for approximately
$560 million)
o Ausenco (global engineering and project delivery group)
• Laura Rocha joins as Chemical Process Engineer, strengthening Axel’s rare earth
processing and metallurgical capabilities with approximately 15 years’ experience,
including:
o Brazilian Rare Earths (ASX: BRE)
o Serra Verde (now part of USA Rare Earth, Nasdaq: USAR)
o Aclara Resources (TSX: ARA)
• The appointments strengthen Axels Brazilian team and add rare earths project
delivery and processing expertise as Axel advances hydrogeological
characterisation, metallurgical optimisation and planning for a controlled in situ
recovery (ISR) field validation programme at Woolrich
Axel REE Limited (ASX: AXL, FSE: HN8, Axel or the Company) is pleased to announce the appointment of
Mr Noeber Orsine as Operations Manager, Brazil, and to highlight the addition of Ms Laura Rocha to its Brazil
technical team as Chemical Process Engineer. The strengthened team will support the next stage of
development at Axel’s Caladão REE–Gallium Project in Minas Gerais, with a focus on the Woolrich ionic-clay
rare earth deposit and proposed in-situ recovery (ISR) development pathway.
Axel REE Managing Director, Dr Patience Mpofu, commented:
"Noeber’s experience in delivering a major Brazilian ionic-clay rare earths project from development
through start-up is particularly relevant to Axel as we move towards field validation at Woolrich.
Together with Laura’s proven rare earth process engineering background and our existing geological
team, we are building the multidisciplinary capability needed to advance Caladão methodically and
responsibly.
Our focus is on integrating the geological, metallurgical and hydrogeological work into a well-
planned programme that generates the technical evidence needed for the next stage of
development."
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
investors@axelreelimited.com.au
Noeber Orsine — Operations Manager, Brazil
Mr Orsine is a senior mining engineer and project executive with more than 25 years’ experience across
mining studies, project development, construction and operational readiness. He previously served as
General Manager – Project Delivery at Serra Verde in Brazil, where he had responsibility for project delivery
through commissioning and start-up at the large-scale ionic-clay rare earths operation.
His background also includes serving as Study Manager on Latin Resources’ Salinas lithium project in Minas
Gerais (now partof PLSGroup Limited ASX:PLS)andas Senior Projects &StudiesManagerat Ausenco, where
he coordinated multidisciplinary technical studies from scoping through to definitive feasibility stage. He
has also held senior roles at ASX-listed Syrah Resources (ASX:SYR) and Alcoa Australia (ASX:AAI), and his
experience spans graphite, lithium, nickel, cobalt and alumina across project delivery, operational
readiness, commissioning and operations.
In his role at Axel, Mr Orsine will coordinate Brazil operations and external technical partners, with
immediate priorities including hydrogeological investigations, detailed project planning and delivery
preparations for the controlled Woolrich ISR field validation programme.
Laura Rocha — Chemical Process Engineer
Ms Rocha brings approximately 15 years of processing and engineering experience, with particular expertise
in rare earth projects. Her previous positions include Process and Engineering Manager at Brazilian Rare
Earths, Senior Process Engineer at Aclara Resources and process engineering and coordination roles with
Serra Verde. She holds a chemical engineering degree and an MBA.
Ms Rocha has been supporting Axel’s metallurgicalprogramme, including technical review and coordination
of laboratory testwork undertaken to assess rare earth leaching and mixed rare earth carbonate (MREC)
product characteristics. Her expertise will support process optimisation, testwork interpretation and
integration of metallurgical data into planning for the Woolrich field programme.
Aligning The Technical Team For Development
The strengthened team brings complementary experience across rare earth project delivery,
hydrometallurgy, geology and resource development. José Sousa, previously Operations Manager, has
transitioned to the role of Geology and Database Manager, reporting to Mr Orsine and retaining responsibility
for drilling programmes and geological data integrity.
Woolrich is Axel’s priority deposit for assessing a controlled ISR field validation programme. Planned
technical work includes continued magnesium sulphate leach optimisation and hydrogeological
characterisation to inform wellfield design and assessment of solution migration, containment and recovery
under field conditions.
This announcement was authorised by the Board of Directors.
For enquiries regarding this release please contact:
Dr Patience Mpofu
Managing Director
E: patience@axelreelimited.com.au
Gabriella Hold
The Capital Network
E: gaby@thecapitalnetwork.com.au
Julia Maguire
The Capital Network
E: julia@thecapitalnetwork.com.au
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
investors@axelreelimited.com.au
About Axel REE
Axel REE is a critical minerals exploration company which is primarily focused on developing the Caladão REE-Gallium
and Caldas REE Projects in Brazil, the second largest country globally in terms of REE reserves.
Axel is advancing a modular development concept at Caladão based on in situ recovery (ISR) of ionic clay-hosted rare
earth mineralisation using magnesium sulphate leaching. This approach aims to minimise surface disturbance and
capital intensity by deploying modular hydrometallurgical plants within wellfields. In parallel, Axel is progressing
metallurgical programmes to unlock additional value from gallium and scandium within the near-surface oxidised
profile.
Deposit JORC Category Tonnes (Mt) TREO (ppm)
Caladão Area A Inferred 233.00 2,133
Marambaia Inferred 126.07 1,154
Tiger Creek Inferred 85.00 1,050
Woolrich Inferred 154.51 1,120
Woolrich Indicated 110.08 1,073
Total Caladão Inferred 598.51 1,512
Total Caladão Indicated 110.08 1,073
Total MRE Inferred + Indicated 708.6 1,443
Global REE Mineral Resource Estimate at the Caladão Project, Minas Gerais
Deposit JORC Category Tonnes (Mt) Gallium (ppm)
Caladão Area A Inferred 100.00 42.23
Marambaia Inferred 126.07 35.80
Tiger Creek Inferred 85.02 40.10
Woolrich Inferred 154.51 34.48
Woolrich Indicated 110.08 35.05
Total Caladão Inferred 465.60 37.53
Total Caladão Indicated 110.08 35.05
Total MRE Inferred + Indicated 575.68 37.05
Global Gallium Mineral Resource Estimate at the Caladão Project, Minas Gerais
Refer ASX: AXL release 24 September 2026, “Caladão Project's Global REE Resource Grows to 0.71 billion Tonnes
Following Woolrich Resource Upgrade Drilling” for further information.
The Company confirms that it is not aware of any new information or data that materially affects the Mineral Resource
Estimates reported in the ASX announcement dated 24 September 2026, and that all material assumptions and
technical parameters underpinning those estimates continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Persons' findings are presented have not been materially
modified from the original announcements.
Forward Looking Statement
This announcement contains projections and forward-looking information that involve various risks and uncertainties
regarding future events. Such forward-looking information can include without limitation statements based on current
expectations involving a number of risks and uncertainties and are not guarantees of future performance of the
Company. These risks and uncertainties could cause actual results and the Company’s plans and objectives to differ
materially from those expressed in the forward-looking information. Actual results and future events could differ
materially from those anticipated in such information. These and all subsequent written and oral forward-looking
information are based on estimates and opinions of management on the dates they are made and expressly qualified
in their entirety by this notice. The Company assumes no obligation to update forward-looking information should
circumstances or management’s estimates or opinions change.
ASX : AXL | FSE: HN8
ACN: 665 921 273
832 High St
Kew East VIC
Australia 3102
www.axelreelimited.com.au
investors@axelreelimited.com.au
https://axelreelimited.com.au/link/P2xDze
Share your feedback
Discover